Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
Comment Building Div Inspection
|
In Progress
|
7/25/2008
|
7/28/2008
|
07/28/2008
|
|
Shannon King
((253) 840-6684)
|
Footing/Setback Inspection
|
In Progress
|
9/16/2008
|
9/16/2008
|
09/16/2008
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
In Progress
|
9/25/2008
|
9/26/2008
|
09/26/2008
|
|
Shannon King
((253) 840-6684)
|
Footing/Setback Inspection
|
In Progress
|
10/1/2008
|
10/2/2008
|
10/02/2008
|
|
Shannon King
((253) 840-6684)
|
Plumbing Below Slab Inspection
|
In Progress
|
10/2/2008
|
10/3/2008
|
10/03/2008
|
|
Shannon King
((253) 840-6684)
|
Plumbing Below Slab Inspection
|
In Progress
|
10/6/2008
|
10/7/2008
|
10/07/2008
|
|
Shannon King
((253) 840-6684)
|
Plumbing Below Slab Inspection
|
In Progress
|
10/8/2008
|
10/8/2008
|
10/08/2008
|
|
Eric Tague
((253) 864-4192)
|
Plumbing Below Slab Inspection
|
In Progress
|
10/16/2008
|
10/16/2008
|
10/16/2008
|
|
Shannon King
((253) 840-6684)
|
Plumbing Below Slab Inspection
|
In Progress
|
10/20/2008
|
10/21/2008
|
10/21/2008
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
In Progress
|
10/22/2008
|
10/23/2008
|
10/23/2008
|
|
Shannon King
((253) 840-6684)
|
Plumbing Below Slab Inspection
|
In Progress
|
10/27/2008
|
10/28/2008
|
10/28/2008
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
In Progress
|
11/3/2008
|
11/4/2008
|
11/04/2008
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
12/19/2008
|
12/19/2008
|
12/19/2008
|
|
Monty Johnson
((253) 770-3326)
|
Slab/Insulation Inspection
|
In Progress
|
12/29/2008
|
12/30/2008
|
12/30/2008
|
|
Shannon King
((253) 840-6684)
|
Shear Wall Inspection
|
In Progress
|
1/2/2009
|
1/5/2009
|
01/05/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
1/12/2009
|
1/13/2009
|
01/13/2009
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
In Progress
|
1/15/2009
|
1/15/2009
|
01/15/2009
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
In Progress
|
1/16/2009
|
1/16/2009
|
01/16/2009
|
|
Monty Johnson
((253) 770-3326)
|
Energy (Insulation) Inspection
|
In Progress
|
1/20/2009
|
1/20/2009
|
01/20/2009
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
|
|
01/21/2009
|
|
rfore
|
Slab/Insulation Inspection
|
In Progress
|
1/21/2009
|
1/22/2009
|
01/22/2009
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
In Progress
|
1/26/2009
|
1/26/2009
|
01/26/2009
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
In Progress
|
1/27/2009
|
1/27/2009
|
01/27/2009
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
1/28/2009
|
1/28/2009
|
01/28/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
1/28/2009
|
1/29/2009
|
01/29/2009
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
1/29/2009
|
1/29/2009
|
01/29/2009
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
In Progress
|
1/29/2009
|
1/29/2009
|
01/29/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
1/29/2009
|
1/29/2009
|
01/29/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
1/30/2009
|
1/30/2009
|
01/30/2009
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
In Progress
|
1/30/2009
|
1/30/2009
|
01/30/2009
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
2/2/2009
|
2/3/2009
|
02/03/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
2/3/2009
|
2/4/2009
|
02/04/2009
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
2/3/2009
|
2/4/2009
|
02/04/2009
|
|
Shannon King
((253) 840-6684)
|
Mechanical Rough In Inspection
|
In Progress
|
2/4/2009
|
2/5/2009
|
02/05/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
2/5/2009
|
2/5/2009
|
02/05/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
2/5/2009
|
2/5/2009
|
02/05/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
2/5/2009
|
2/6/2009
|
02/06/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
2/6/2009
|
2/6/2009
|
02/06/2009
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
2/6/2009
|
2/6/2009
|
02/06/2009
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
In Progress
|
2/10/2009
|
2/11/2009
|
02/11/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
2/10/2009
|
2/11/2009
|
02/11/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
|
|
02/12/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
|
|
02/17/2009
|
|
Monty Johnson
((253) 770-3326)
|
Frame Inspection
|
In Progress
|
2/13/2009
|
2/17/2009
|
02/17/2009
|
|
Monty Johnson
((253) 770-3326)
|
Gas Test Inspection
|
In Progress
|
2/17/2009
|
2/18/2009
|
02/18/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
2/19/2009
|
2/20/2009
|
02/20/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
2/20/2009
|
2/20/2009
|
02/20/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
2/23/2009
|
2/24/2009
|
02/24/2009
|
|
rfore
|
Frame Inspection
|
In Progress
|
2/23/2009
|
2/24/2009
|
02/24/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
2/25/2009
|
2/26/2009
|
02/26/2009
|
|
rfore
|
Energy (Insulation) Inspection
|
In Progress
|
2/26/2009
|
2/26/2009
|
02/26/2009
|
|
rfore
|
Frame Inspection
|
In Progress
|
2/27/2009
|
2/27/2009
|
02/27/2009
|
|
rfore
|
Wallboard / Drywall Inspection
|
In Progress
|
3/2/2009
|
3/2/2009
|
03/02/2009
|
|
Shannon King
((253) 840-6684)
|
Mechanical Rough In Inspection
|
In Progress
|
3/3/2009
|
3/3/2009
|
03/03/2009
|
|
Shannon King
((253) 840-6684)
|
Mechanical Rough In Inspection
|
In Progress
|
3/3/2009
|
3/4/2009
|
03/04/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
3/5/2009
|
3/5/2009
|
03/05/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
Approved
|
3/5/2009
|
3/6/2009
|
03/06/2009
|
|
rfore
|
Wallboard / Drywall Inspection
|
In Progress
|
3/6/2009
|
3/9/2009
|
03/09/2009
|
|
rfore
|
Plumbing Rough In Inspection
|
Approved
|
3/9/2009
|
3/9/2009
|
03/09/2009
|
|
rfore
|
Frame Inspection
|
In Progress
|
3/9/2009
|
3/9/2009
|
03/09/2009
|
|
rfore
|
Wallboard / Drywall Inspection
|
In Progress
|
3/12/2009
|
3/12/2009
|
03/12/2009
|
|
rfore
|
Plumbing Rough In Inspection
|
In Progress
|
3/13/2009
|
3/16/2009
|
03/16/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
3/23/2009
|
3/23/2009
|
03/23/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
In Progress
|
3/23/2009
|
3/24/2009
|
03/24/2009
|
|
rfore
|
Plumbing Rough In Inspection
|
In Progress
|
3/23/2009
|
3/24/2009
|
03/24/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
3/23/2009
|
3/24/2009
|
03/24/2009
|
|
rfore
|
Frame Inspection
|
In Progress
|
3/23/2009
|
3/24/2009
|
03/24/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
3/24/2009
|
3/25/2009
|
03/25/2009
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
In Progress
|
3/30/2009
|
3/30/2009
|
03/30/2009
|
|
rfore
|
Plumbing Below Slab Inspection
|
In Progress
|
4/1/2009
|
4/2/2009
|
04/02/2009
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
Approved
|
4/2/2009
|
4/2/2009
|
04/02/2009
|
|
Shannon King
((253) 840-6684)
|
Roof Sheathing Inspection
|
Approved
|
4/2/2009
|
4/2/2009
|
04/02/2009
|
|
Shannon King
((253) 840-6684)
|
Foundation/Rebar Inspection
|
In Progress
|
4/9/2009
|
4/9/2009
|
04/09/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
5/1/2009
|
5/4/2009
|
05/04/2009
|
|
rfore
|
Gas Test Inspection
|
In Progress
|
5/7/2009
|
5/8/2009
|
05/08/2009
|
|
Shannon King
((253) 840-6684)
|
Hydronic Piping Inspection
|
In Progress
|
5/7/2009
|
5/8/2009
|
05/08/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
5/7/2009
|
5/8/2009
|
05/08/2009
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
In Progress
|
5/8/2009
|
5/8/2009
|
05/08/2009
|
|
Shannon King
((253) 840-6684)
|
Foundation/Rebar Inspection
|
In Progress
|
5/11/2009
|
5/11/2009
|
05/11/2009
|
|
Shannon King
((253) 840-6684)
|
Ceiling Grid/T-Bar Inspection
|
In Progress
|
5/27/2009
|
5/28/2009
|
05/28/2009
|
|
Shannon King
((253) 840-6684)
|
Ceiling Grid/T-Bar Inspection
|
In Progress
|
5/29/2009
|
5/29/2009
|
05/29/2009
|
|
Shannon King
((253) 840-6684)
|
Foundation/Rebar Inspection
|
In Progress
|
5/29/2009
|
6/1/2009
|
06/01/2009
|
|
Shannon King
((253) 840-6684)
|
Gas Test Inspection
|
In Progress
|
5/29/2009
|
6/1/2009
|
06/01/2009
|
|
Shannon King
((253) 840-6684)
|
Ceiling Grid/T-Bar Inspection
|
In Progress
|
6/9/2009
|
6/10/2009
|
06/10/2009
|
|
Shannon King
((253) 840-6684)
|
Ceiling Grid/T-Bar Inspection
|
In Progress
|
6/10/2009
|
6/11/2009
|
06/11/2009
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
In Progress
|
6/25/2009
|
6/25/2009
|
06/25/2009
|
|
Shannon King
((253) 840-6684)
|
Mechanical Rough In Inspection
|
In Progress
|
6/26/2009
|
6/29/2009
|
06/29/2009
|
|
Shannon King
((253) 840-6684)
|
Gas Test Inspection
|
Approved
|
7/1/2009
|
7/2/2009
|
07/02/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
7/2/2009
|
7/6/2009
|
07/06/2009
|
|
rfore
|
Ceiling Grid/T-Bar Inspection
|
Approved
|
7/6/2009
|
7/6/2009
|
07/06/2009
|
|
rfore
|
Mechanical Rough In Inspection
|
In Progress
|
7/6/2009
|
7/7/2009
|
07/07/2009
|
|
rfore
|
Fire Final Inspection
|
In Progress
|
7/9/2009
|
7/9/2009
|
07/09/2009
|
|
rfore
|
Fire Final Inspection
|
Approved
|
9/2/2009
|
9/2/2009
|
09/02/2009
|
|
Shannon King
((253) 840-6684)
|
Mechanical Final Inspection
|
In Progress
|
|
|
09/04/2009
|
|
Ray Cockerham
((253) 841-5585)
|
Mechanical Final Inspection
|
Approved
|
9/8/2009
|
9/8/2009
|
09/08/2009
|
|
Shannon King
((253) 840-6684)
|
Building Final Inspection
|
In Progress
|
11/5/2009
|
11/5/2009
|
11/05/2009
|
|
rfore
|
Final TCO Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Building Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Plumbing Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Mechanical Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Building Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Engineering Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Building Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Planning Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Comment Building Div Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Building Final Inspection
|
VOID
|
|
|
12/09/2021
|
|
Legacy user
|
Comment Building Div Inspection
|
VOID
|
7/31/2008
|
8/1/2008
|
12/09/2021
|
|
Ray Cockerham
((253) 841-5585)
|
Foundation/Rebar Inspection
|
VOID
|
9/10/2008
|
9/11/2008
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
VOID
|
9/25/2008
|
9/25/2008
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
VOID
|
10/13/2008
|
10/14/2008
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
VOID
|
11/13/2008
|
11/13/2008
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
VOID
|
1/8/2009
|
1/9/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
VOID
|
1/13/2009
|
1/14/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Slab/Insulation Inspection
|
VOID
|
1/14/2009
|
1/14/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
VOID
|
1/20/2009
|
1/21/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
VOID
|
1/21/2009
|
1/22/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
VOID
|
2/5/2009
|
2/5/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Gas Test Inspection
|
VOID
|
2/5/2009
|
2/5/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
VOID
|
2/12/2009
|
2/12/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
VOID
|
2/23/2009
|
2/24/2009
|
12/09/2021
|
|
rfore
|
Plumbing Rough In Inspection
|
VOID
|
2/26/2009
|
2/26/2009
|
12/09/2021
|
|
rfore
|
Energy (Insulation) Inspection
|
VOID
|
3/2/2009
|
3/3/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Wallboard / Drywall Inspection
|
VOID
|
3/2/2009
|
3/3/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Frame Inspection
|
VOID
|
3/11/2009
|
3/12/2009
|
12/09/2021
|
|
rfore
|
Roof Sheathing Inspection
|
VOID
|
3/31/2009
|
4/1/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Energy (Insulation) Inspection
|
VOID
|
3/31/2009
|
4/1/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Foundation/Rebar Inspection
|
VOID
|
4/7/2009
|
4/8/2009
|
12/09/2021
|
|
rfore
|
Mechanical Rough In Inspection
|
VOID
|
4/29/2009
|
4/30/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Fire Sprinkler Cover Inspection
|
VOID
|
5/8/2009
|
5/11/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Hydrostatic Test 200Lbs 2Hrs
|
VOID
|
5/8/2009
|
5/11/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Ceiling Grid/T-Bar Inspection
|
VOID
|
5/21/2009
|
5/21/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Ceiling Grid/T-Bar Inspection
|
VOID
|
5/22/2009
|
5/26/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Final Inspection
|
VOID
|
6/11/2009
|
6/12/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Comment Building Div Inspection
|
VOID
|
6/16/2009
|
6/17/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Comment Building Div Inspection
|
VOID
|
6/19/2009
|
6/19/2009
|
12/09/2021
|
|
rfore
|
Fire Final Inspection
|
VOID
|
6/22/2009
|
6/22/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Rough In Inspection
|
VOID
|
6/22/2009
|
6/23/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Mechanical Rough In Inspection
|
VOID
|
6/24/2009
|
6/24/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Mechanical Underslab Inspection
|
VOID
|
6/25/2009
|
6/26/2009
|
12/09/2021
|
|
rfore
|
Mechanical Rough In Inspection
|
VOID
|
6/26/2009
|
6/26/2009
|
12/09/2021
|
|
rfore
|
Comment Building Div Inspection
|
VOID
|
7/1/2009
|
7/2/2009
|
12/09/2021
|
|
rfore
|
Mechanical Rough In Inspection
|
VOID
|
7/1/2009
|
7/2/2009
|
12/09/2021
|
|
rfore
|
Comment Building Div Inspection
|
VOID
|
7/2/2009
|
7/6/2009
|
12/09/2021
|
|
rfore
|
Fire Final Inspection
|
VOID
|
7/8/2009
|
7/8/2009
|
12/09/2021
|
|
rfore
|
Building Final Inspection
|
VOID
|
8/28/2009
|
8/31/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Final Inspection
|
VOID
|
8/31/2009
|
9/1/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Building Final Inspection
|
VOID
|
8/31/2009
|
9/1/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Final Inspection
|
VOID
|
9/2/2009
|
9/2/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Mechanical Final Inspection
|
VOID
|
9/3/2009
|
9/3/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Final TCO Inspection
|
VOID
|
9/8/2009
|
9/8/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Plumbing Final Inspection
|
VOID
|
9/8/2009
|
9/8/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Comment Building Div Inspection
|
VOID
|
10/30/2009
|
11/2/2009
|
12/09/2021
|
|
rfore
|
Comment Building Div Inspection
|
VOID
|
11/2/2009
|
11/3/2009
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|
Comment Building Div Inspection
|
VOID
|
6/11/2010
|
6/11/2010
|
12/09/2021
|
|
Shannon King
((253) 840-6684)
|