Summary

B-08-0064
Building
Closed
ST OF WA PIERCE COLLEGE
Other
NEW COMMERCIAL - PIERCE COLLEGE - ARTS & ALLIED HEALTH BUILDING
07/10/2008
07/10/2008
02/14/2011
10/06/2021

Locations

Reviews

There are no reviews for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Below Slab Inspection In Progress 10/27/2008
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection In Progress 11/05/2008
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection In Progress 11/19/2008
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection In Progress 11/21/2008
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection In Progress 12/10/2008
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection In Progress 1/9/2009 1/9/2009 01/09/2009
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection In Progress 1/15/2009 1/16/2009 01/16/2009
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection In Progress 1/20/2009 1/20/2009 01/20/2009
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Approved 01/21/2009
rfore
Plumbing Below Slab Inspection In Progress 1/22/2009 1/22/2009 01/22/2009
rfore
Slab/Insulation Inspection In Progress 1/26/2009 1/27/2009 01/27/2009
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection Approved 2/3/2009 2/4/2009 02/04/2009
Monty Johnson ((253) 770-3326)
Shear Wall Inspection In Progress 7/7/2009 7/8/2009 07/08/2009
Eric Tague ((253) 864-4192)
Energy (Insulation) Inspection In Progress 7/8/2009 7/9/2009 07/09/2009
rfore
Wallboard / Drywall Inspection In Progress 08/10/2009
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 8/7/2009 8/10/2009 08/10/2009
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 8/14/2009 8/14/2009 08/14/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 08/19/2009
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection In Progress 8/18/2009 8/19/2009 08/19/2009
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 8/20/2009 8/20/2009 08/20/2009
rfore
Wallboard / Drywall Inspection In Progress 8/31/2009 8/31/2009 08/31/2009
rfore
Energy (Insulation) Inspection In Progress 09/09/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/9/2009 09/09/2009
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 9/11/2009 9/14/2009 09/14/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/15/2009 09/15/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/24/2009 09/24/2009
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 9/28/2009 09/28/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/29/2009 09/29/2009
rfore
Energy (Insulation) Inspection In Progress 9/29/2009 9/29/2009 09/29/2009
rfore
Wallboard / Drywall Inspection In Progress 10/1/2009 10/01/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 10/8/2009 10/08/2009
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 10/8/2009 10/08/2009
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 10/19/2009 10/19/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 10/20/2009 10/20/2009
rfore
Frame Inspection In Progress 8/31/2009 10/26/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 10/26/2009 10/26/2009
rfore
Frame Inspection In Progress 10/30/2009 10/30/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 10/30/2009 10/30/2009
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 11/12/2009 11/12/2009
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 11/17/2009 11/17/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 11/17/2009 11/17/2009
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 11/30/2009 11/30/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 11/30/2009 11/30/2009
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 12/1/2009 12/01/2009
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection In Progress 12/04/2009
rfore
Wallboard / Drywall Inspection In Progress 12/7/2009 12/07/2009
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 12/10/2009 12/10/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 12/15/2009 12/15/2009
rfore
Frame Inspection In Progress 12/17/2009 12/17/2009
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection In Progress 12/23/2009 12/23/2009
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 12/23/2009 12/23/2009
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 12/28/2009 12/28/2009
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 1/7/2010 01/07/2010
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 1/8/2010 01/08/2010
rfore
Frame Inspection In Progress 1/11/2010 01/11/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 1/11/2010 01/11/2010
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection In Progress 1/13/2010 01/13/2010
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 01/14/2010
rfore
Frame Inspection In Progress 1/14/2010 01/14/2010
rfore
Energy (Insulation) Inspection In Progress 01/19/2010
rfore
Mechanical Rough In Inspection In Progress 1/19/2010 01/19/2010
rfore
Frame Inspection In Progress 1/19/2010 01/19/2010
rfore
Wallboard / Drywall Inspection In Progress 1/19/2010 01/19/2010
rfore
Frame Inspection In Progress 01/25/2010
rfore
Energy (Insulation) Inspection In Progress 01/25/2010
rfore
Wallboard / Drywall Inspection In Progress 1/25/2010 01/25/2010
rfore
Frame Inspection In Progress 1/26/2010 01/26/2010
rfore
Plumbing Rough In Inspection In Progress 1/29/2010 2/1/2010 02/01/2010
rfore
Energy (Insulation) Inspection In Progress 2/3/2010 02/03/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 2/3/2010 02/03/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 2/3/2010 02/03/2010
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 02/04/2010
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 2/4/2010 02/04/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 2/5/2010 02/05/2010
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 02/10/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 2/11/2010 02/10/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 02/11/2010
rfore
Mechanical Rough In Inspection In Progress 2/11/2010 02/11/2010
rfore
Mechanical Rough In Inspection In Progress 2/12/2010 02/12/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 2/16/2010 02/16/2010
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 2/16/2010 02/16/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 2/19/2010 02/19/2010
rfore
Wallboard / Drywall Inspection In Progress 2/23/2010 02/23/2010
rfore
Plumbing Rough In Inspection In Progress 2/24/2010 02/24/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 3/1/2010 03/01/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 3/5/2010 03/05/2010
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection In Progress 3/10/2010 03/10/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 3/12/2010 03/12/2010
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection In Progress 3/17/2010 03/17/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 3/17/2010 03/17/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 3/18/2010 03/17/2010
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection Approved 3/19/2010 3/19/2010 03/19/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 3/22/2010 03/22/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 3/22/2010 03/22/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 3/23/2010 03/23/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 3/26/2010 03/26/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 3/30/2010 03/30/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 4/2/2010 04/02/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 4/8/2010 04/08/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 4/8/2010 04/08/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 4/12/2010 04/12/2010
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 4/12/2010 04/12/2010
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 4/16/2010 04/16/2010
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection In Progress 4/29/2010 04/29/2010
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Approved 05/21/2010
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection Approved 6/2/2010 06/02/2010
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Approved 6/3/2010 06/03/2010
Monty Johnson ((253) 770-3326)
Shower Pan Inspection Approved 7/23/2010 07/23/2010
Shannon King ((253) 840-6684)
Fire Final Inspection Approved 8/16/2010 08/16/2010
kenb
Plumbing Final Inspection In Progress 8/18/2010 08/18/2010
rfore
Mechanical Final Inspection In Progress 8/18/2010 08/18/2010
rfore
Mechanical Final Inspection Approved 9/2/2010 09/02/2010
Monty Johnson ((253) 770-3326)
Fire Final Inspection Approved 09/16/2010
kenb
Building Final Inspection In Progress 9/21/2010 09/21/2010
Monty Johnson ((253) 770-3326)
Engineering Final Inspection Approved 12/19/2011
charris
Plumbing Below Slab Inspection VOID 12/09/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 12/09/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 12/09/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 12/09/2021
Monty Johnson ((253) 770-3326)
Shower Pan Inspection VOID 12/09/2021
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 12/09/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 8/28/2008 8/29/2008 12/09/2021
Eric Tague ((253) 864-4192)
Plumbing Below Slab Inspection VOID 1/20/2009 1/21/2009 12/09/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 3/2/2009 3/3/2009 12/09/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 7/8/2009 7/8/2009 12/09/2021
rfore
Frame Inspection VOID 8/11/2009 8/12/2009 12/09/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 8/25/2009 8/25/2009 12/09/2021
rfore
Plumbing Rough In Inspection VOID 12/4/2009 12/09/2021
rfore
Frame Inspection VOID 12/8/2009 12/09/2021
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 12/31/2009 12/09/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 1/21/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 1/26/2010 12/09/2021
rfore
Plumbing Rough In Inspection VOID 1/29/2010 1/29/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 2/5/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 2/11/2010 12/09/2021
rfore
Frame Inspection VOID 3/9/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 3/9/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection VOID 3/19/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 4/13/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 5/4/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 5/11/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 5/11/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Plumbing Final Inspection VOID 5/12/2010 5/12/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 5/17/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 5/21/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 7/2/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 7/9/2010 12/09/2021
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 7/12/2010 12/09/2021
Shannon King ((253) 840-6684)
Shower Pan Inspection VOID 7/14/2010 12/09/2021
Shannon King ((253) 840-6684)
Shower Pan Inspection VOID 7/15/2010 12/09/2021
Shannon King ((253) 840-6684)
Shower Pan Inspection VOID 7/19/2010 12/09/2021
Shannon King ((253) 840-6684)
Building Final Inspection VOID 8/6/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 8/12/2010 12/09/2021
Shannon King ((253) 840-6684)
Building Final Inspection VOID 8/16/2010 12/09/2021
Ray Cockerham ((253) 841-5585)
Mechanical Final Inspection VOID 8/12/2010 8/16/2010 12/09/2021
Shannon King ((253) 840-6684)
Building Final Inspection VOID 8/26/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 8/30/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Mechanical Final Inspection VOID 8/30/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 8/31/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 9/2/2010 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 9/23/2010 12/09/2021
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: Final approval by the Building Official is required prior to occupancy. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE STAGES OF CONSTRUCTION SURFACE STORM WATER SHALL BE DIVERTED FROM THE BUILDING SITE AND SHALL NOT DRAIN ONTO ADJACENT PROPERTIES. Rain drains shall connect to the storm sewer or discharge at the street. I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. BY LEAVING THE CONTRACTOR INFORMATION SECTION BLANK, I HEREBY CERTIFY FURTHER THAT CONTRACTORS (GENERAL OR SUBCONTRACTORS) WILL NOT BE HIRED TO PERFORM ANY WORK IN ASSOCIATION WITH THIS PERMIT. I ALSO CERTIFY THAT IF I DO CHOOSE TO HIRE A CONTRACTOR (GENERAL OR SUBCONTRACTOR) I WILL ONLY HIRE THOSE CONTRACTORS THAT ARE LICENSED BY THE STATE OF WASHINGTON.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS Planning Conditions: 1. All ground and roof related mechanical equipment shall be screened. 2. All Development associated with this permit shall adhere to the SEPA MDNS mitigating measures and associated DRT letters. Fire Review Conditions: 1. Fire alarm and fire sprinkler permits are required. 2. Emergency lighting test will be required. 3. Knox box shall be located at main entrance. 4. Fire lane markings shall be installed prior to final. 5. Fire final is required. BUILDING REVIEW CONDITIONS: FINAL LETTERS ARE REQIURED FROM THE ENGINEER OF RECORD AND ARCHITECT OF RECORD. A COVER LETTER FROM THE MECHANCIAL ENGINEER OF RECORD WILL BE REQUIRED WITH THE PRELIMINARY COMMISSIONING REPORT. Special inspection is required. Quality assurance plan is required prior to starting work. The contractor shall submit a plan conforming with Chapter 17 IBC. All air moving units over 2,000 CFM or units supply one area shall have automatic shut-off's upon the detection of smoke in the air IMC All mechanical equipment and duct work shall comply with IMC. Final electrical inspection approval is required prior to the building department final approval. The APPROVED CONSTRUCTION PLANS and ALL ENGINEERING must be posted on the job at all inspections in a visible and readily accessible location.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.