CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-09-0538


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-09-0538
UNKOWN LEGACY PERMIT TYPE
Closed
BCC PUYALLUP LLC
Other
T.I. COMM - DATA CENTER - BUILDING D - SOUTH HILL BUSINESS & TECHNOLOGY CENTER
09/02/2009
03/30/2010
07/13/2010
03/30/2010

Locations

Property
0419034038

* Address
1111 39TH AVE SE

Reviews

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 03/25/2010
Building Review Approved 03/24/2010
Planning Review Approved 02/23/2010
Engineering Review Approved 02/02/2010
Building Review Approved 01/13/2010
Fire Review Approved 01/13/2010
Building Review Approved 11/16/2009
Fire Review Approved 09/14/2009
Engineering Traffic Review Approved 09/11/2009
Planning Review Approved 09/10/2009
Engineering Review Approved 09/03/2009

Fees

Paid Fees Amount Paid Owing Date Paid
Mechanical Plan Review Fee $369.46 $369.46 Paid 03/30/2010
No
Mechanical Permit Fee $568.40 $568.40 Paid 03/30/2010
No
Planning Base Fee $30.00 $30.00 Paid 03/30/2010
No
Building Plan Review Fee $18,829.69 $18,829.69 Paid 03/30/2010
No
Building Permit Fee $28,968.75 $28,968.75 Paid 03/30/2010
No
Mechanical Plan Review Fee $635.31 $635.31 Paid 01/14/2010
No
Building Permit Fee $6,338.75 $6,338.75 Paid 01/14/2010
No
Building Plan Review Fee $4,120.19 $4,120.19 Paid 01/14/2010
No
Mechanical Permit Fee $977.40 $977.40 Paid 01/14/2010
No
Mechanical Plan Review Fee $80.99 $80.99 Paid 09/15/2009
No
Building Division Fee (Hourly) $110.00 $110.00 Paid 09/15/2009
No
Legacy Fee $110.00 $110.00 Paid 09/15/2009
No
Mechanical Permit Fee $124.60 $124.60 Paid 09/15/2009
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: Final approval by the Building Official is required prior to occupancy. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE STAGES OF CONSTRUCTION SURFACE STORM WATER SHALL BE DIVERTED FROM THE BUILDING SITE AND SHALL NOT DRAIN ONTO ADJACENT PROPERTIES. Rain drains shall connect to the storm sewer or discharge at the street. I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. BY LEAVING THE CONTRACTOR INFORMATION SECTION BLANK, I HEREBY CERTIFY FURTHER THAT CONTRACTORS (GENERAL OR SUBCONTRACTORS) WILL NOT BE HIRED TO PERFORM ANY WORK IN ASSOCIATION WITH THIS PERMIT. I ALSO CERTIFY THAT IF I DO CHOOSE TO HIRE A CONTRACTOR (GENERAL OR SUBCONTRACTOR) I WILL ONLY HIRE THOSE CONTRACTORS THAT ARE LICENSED BY THE STATE OF WASHINGTON.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1. Manufactures Installation Instructions for the Access Flooring must be onsite and available for review at time of inspection. 2. A final special inspection is required prior to final building approval. 3. A final letter from the Structural Engineer and the Mechanical Engineer is required prior to the final building approval. The letter must document that the structural and mechanical plans were adhered to during the construction and that all elements of the plans were followed at that the construction is approved by the appropriate engineers. 4. Electical final is required prior to building final approval. 5. Any fill for building construction must be approved by a Geotechnical Engineer. 6. Keep approved plans on jobsite along with all supporting documents for a complete set of plans. 7. Label all process piping appropriately. FIRE REVIEW: 1. FACILITY CLOSURE REPORT FOR THE HAZARDOUS MATERIALS SHALL BE SUBMITTED TO THE FIRE CODE OFFICIAL. 2. FIRE SPRINKLER, FIRE ALARM AND FIRE SUPPRESSION SYSTEMS WILL REQUIRE SEPARATE PERMITS. 3. FIRE FINAL REQUIRED PRIOR TO OCCUPANCY. Building Comment UPS and Battery Storage: Preliminary commissioning of the ventilation equipment must be provided with sizing and ventilation rates compatible with all applicable code requirements. Electrical shall comply with the NEC subject to electrical inspection approval by Labor and Industries and other code requirements.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.