Summary

B-09-0684
Demolition
Closed
PUYALLUP SCH DIST #3
Demolition
DEMO COMM - QUEST BUILDING (428 11TH ST SW)
11/06/2009
11/20/2009
05/19/2010
12/07/2009

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 11/19/2009
Planning Review Approved 11/10/2009
Building Review Approved 11/09/2009

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 11/20/2009
No
Demo Sewer Service Fee $30.00 $30.00 Paid 11/20/2009
No
Building Permit Fee $153.25 $153.25 Paid 11/20/2009
No
Legacy Fee $430.00 $430.00 Paid 11/20/2009
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection Approved 12/4/2009 12/7/2009 12/07/2009
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 12/09/2021
Legacy user

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: Final approval by the Building Official is required prior to occupancy. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE STAGES OF CONSTRUCTION SURFACE STORM WATER SHALL BE DIVERTED FROM THE BUILDING SITE AND SHALL NOT DRAIN ONTO ADJACENT PROPERTIES. Rain drains shall connect to the storm sewer or discharge at the street. I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. BY LEAVING THE CONTRACTOR INFORMATION SECTION BLANK, I HEREBY CERTIFY FURTHER THAT CONTRACTORS (GENERAL OR SUBCONTRACTORS) WILL NOT BE HIRED TO PERFORM ANY WORK IN ASSOCIATION WITH THIS PERMIT. I ALSO CERTIFY THAT IF I DO CHOOSE TO HIRE A CONTRACTOR (GENERAL OR SUBCONTRACTOR) I WILL ONLY HIRE THOSE CONTRACTORS THAT ARE LICENSED BY THE STATE OF WASHINGTON. ASBESTOS REMOVAL TO BE COMPLETED PER PSCAA REQUIREMENTS.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1. The applicant shall be responsible to cut and cap the side sewer at property line. The existing side sewer may not be reused. Contact the Engineering Inspector at (253) 405-1707 to schedule an inspection when the sewer line is still exposed. 2. The City Water Division shall remove the existing water service at the main. The meter location address is 428 11th St SW. 3. Any fire alarm work necessary to keep other portables operable shall be completed. Do not demo fire alarm until all other portables are connected to another fire alarm system.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.