CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-10-0682


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-10-0682
Residential - Addition
Closed
Addition
SFR BUILD ADDITION- 95 SQ FT BACK DECK
10/19/2010
10/22/2010
04/17/2011
11/10/2021

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 10/20/2010
Planning Review Approved 10/19/2010

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 10/22/2010
No
Building Permit Fee $64.65 $64.65 Paid 10/22/2010
No
Planning Review Fee $42.02 $42.02 Paid 10/19/2010
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Approved 10/29/2010 10/29/2010
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Approved 11/18/2010 11/19/2010
Shannon King ((253) 840-6684)
Building Final Inspection VOID 12/09/2021
Gary Webster ((253) 841-5590)
Building Final Inspection VOID 12/09/2021
Legacy user
Fire Final Inspection VOID 12/09/2021
Legacy user
Building Final Inspection VOID 12/09/2021
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 12/09/2021
charris
Engineering Final Inspection VOID 11/18/2010 12/09/2021
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
Final approval by the Building Official is required prior to occupancy. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE STAGES OF CONSTRUCTION SURFACE STORM WATER SHALL BE DIVERTED FROM THE BUILDING SITE AND SHALL NOT DRAIN ONTO ADJACENT PROPERTIES. Rain drains shall connect to the storm sewer or discharge at the street. I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. BY LEAVING THE CONTRACTOR INFORMATION SECTION BLANK, I HEREBY CERTIFY FURTHER THAT CONTRACTORS (GENERAL OR SUBCONTRACTORS) WILL NOT BE HIRED TO PERFORM ANY WORK IN ASSOCIATION WITH THIS PERMIT. I ALSO CERTIFY THAT IF I DO CHOOSE TO HIRE A CONTRACTOR (GENERAL OR SUBCONTRACTOR) I WILL ONLY HIRE THOSE CONTRACTORS THAT ARE LICENSED BY THE STATE OF WASHINGTON.
Engineering Residential Standard Conditions Resolved Standard Conditions
Engineering Division
* THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 253-445-4795 OR 253-445-5092 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage, per City Standards * Sanitary sewer clean-out to be installed at the property line. If located in the driveway area, it must be placed in a frame and covered, per City Standards. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Storm water runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * A separate Right of Way Permit is required by a licenced and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards. * Property owner must install a private pump system per city standards to tie into existing force main. * This property lies within the AO Flood Zone as defined by the August 15, 1980 Flood Insurance Rate Map: a. New residential construction on this lot will require that the lowest floor, including the basement, shall be elevated 1-foot above the highest adjacent grade of the site. (PMC21.07.060(4)) b. Non-residential construction on this lot will require that the lowest floor, including the basement, shall be elevated above the grade of the building site. The building site shall be filled to an elevation at least 1-foot above the crown of the highest adjacent public road for at least 15-feet beyond the perimeter around the house. (PMC 21.07.060(4)) c. Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1-foot above grade. (PMC 21.07.060(2)) d. Steps shall be taken to prevent drainage onto adjacent lots. No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Elevation Certificate is completed and submitted to the City of Puyallup.
Mechanical and Plumbing OTC Conditions Resolved Standard Conditions
Building Division
REQUIRED INSPECTIONS INSPECTION INSPECTION Code Code 2110 FOOTING/SETBACK 2235 FRAME 2115 FOUNDATION/REBAR 2240 COMBINATION FRAME AND ROUGH IN 2120 UNDERFLOOR 9000 PLANNING FINAL BUILDING PERMIT 2125 SLAB/INSULATION 9100 ENGINEERING FINAL BUILDING PERMIT 2210 ROOF SHEATHING 9200 FIRE FINAL BUILDING PERMIT 2215 SHEARWALL 9900 FINAL RESIDENTIAL 2230 ENERGY INSPECTION This is a general list, other inspections may be requried.
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.