Permit Application Status

B-11-0277


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-11-0277
Residential - New Single Family Dwelling
Closed
NYBO CURTIS
Other
NEW SFR
05/24/2011
06/10/2011
12/20/2011
11/14/2011

Locations

Property
0419091045

Property
0420331084

Property
0420338031

Property
0420338032

Property
4320000160

Property
4595000031

Address
1919 7TH ST SW, PUYALLUP, WA 98371

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 06/02/2011
Building Review Approved 06/01/2011
Fire Review Approved 05/27/2011
Engineering Review Approved 05/25/2011

Fees

Paid Fees Amount Paid Owing Date Paid
Mechanical Permit Fee $151.75 $151.75 Paid 06/10/2011
No
Water System Development Charge $3,130.00 $3,130.00 Paid 06/10/2011
No
Plumbing Permit Fee $66.00 $66.00 Paid 06/10/2011
No
Plumbing 1&2 Family Dwellings Fee $462.00 $462.00 Paid 06/10/2011
No
Legacy Fee $4,545.00 $4,545.00 Paid 06/10/2011
No
Traffic Impact Fee (SFR/ADU) $4,545.00 $4,545.00 Paid 06/10/2011
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 06/10/2011
No
Park Impact Fee $2,300.00 $2,300.00 Paid 06/10/2011
No
Water Connection Fee $508.00 $508.00 Paid 06/10/2011
No
Building Permit Fee $2,679.35 $2,679.35 Paid 06/10/2011
No
Sanitary Sewer Connection Fee $635.00 $635.00 Paid 06/10/2011
No
Legacy Fee $1,760.00 $1,760.00 Paid 06/10/2011
No
Sewer System Development Charge $4,520.00 $4,520.00 Paid 06/10/2011
No
Plumbing Plan Review Fee $42.90 $42.90 Paid 05/24/2011
No
Mechanical Plan Review Fee $98.64 $98.64 Paid 05/24/2011
No
Planning Review Fee $1,741.58 $1,741.58 Paid 05/24/2011
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Approved 6/22/2011 06/23/2011
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Approved 6/27/2011 06/27/2011
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection Approved 7/5/2011 07/05/2011
rfore
Plumbing Below Slab Inspection Approved 7/5/2011 7/5/2011 07/05/2011
rfore
Underfloor Inspection Approved 7/19/2011 07/19/2011
Monty Johnson ((253) 770-3326)
Shear Wall Inspection Approved 8/11/2011 08/11/2011
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection Approved 8/11/2011 08/11/2011
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection In Progress 8/24/2011 08/24/2011
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection In Progress 8/29/2011 08/29/2011
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Approved 08/30/2011
Shannon King ((253) 840-6684)
Frame Inspection Approved 08/30/2011
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Approved 8/30/2011 08/30/2011
Shannon King ((253) 840-6684)
Storm Inspection Approved 11/07/2011
Marcus Sedlickas ((253) 405-1707)
Frontage/Driveway Inspection Approved 11/07/2011
Marcus Sedlickas ((253) 405-1707)
Water Inspection Approved 11/07/2011
Marcus Sedlickas ((253) 405-1707)
Engineering Final Inspection Approved 11/8/2011 11/08/2011
Monty Johnson ((253) 770-3326)
Building Final Inspection Approved 11/14/2011 11/14/2011
Monty Johnson ((253) 770-3326)
Sidesewer Inspection VOID 12/09/2021
Marcus Sedlickas ((253) 405-1707)
Footing/Setback Inspection VOID 6/21/2011 12/09/2021
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 8/9/2011 12/09/2021
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 8/22/2011 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 11/8/2011 12/09/2021
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington. PLANNING CONDITIONS: 1. PER PMC 20.20 ADU'S ARE NOT PERMITTED IN THIS ZONE. THE DOWNSTAIRS KITCHENETTE SHALL NOT INCLUDE A RANGE/OVEN TO NOT MEET THE DEFINITION OF "FUNCTIONAL KITCHEN". 2. ARBORIST REPORT IS APPROVED; COTTONWOOD TREES MAY BE REMOVED.
Engineering Residential Standard Conditions Resolved Engineering Division Standard Conditions
: * The Applicant is responsible to call the Engineering Inspector at 253-405-1707 to schedule a side sewer inspection PRIOR to backfilling. * Curb, gutter, sidewalk and approach must be poured per City Standards. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a Right of Way permit. * Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage, per City Standards * Sanitary sewer clean-out to be installed at the property line. If located in the driveway area, it must be placed in a frame and covered, per City Standards. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Storm water runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Mechanical and Plumbing OTC Conditions Resolved Building Division Standard Conditions
: REQUIRED INSPECTIONS INSPECTION INSPECTION Code Code 2110 FOOTING/SETBACK 9000 PLANNING FINAL BUILDING PERMIT 2115 FOUNDATION/REBAR 6205 SIDESEWER 2120 UNDERFLOOR 6405 STORM 2125 SLAB/INSULATION 6605 WATER 2210 ROOF SHEATHING 6705 FRONTAGE/DRIVEWAY 2215 SHEARWALL 9100 ENGINEERING FINAL BUILDING PERMIT 2230 ENERGY INSPECTION 9900 FINAL RESIDENTIAL 2235 FRAME 2240 COMBINATION FRAME AND ROUGH IN This is a general list, other inspections may be requried.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.