Summary

B-13-0076
Commercial - New Construction
Expired
DEBERRY JAMES & HELENE
Other
MODIFICATIONOF EXISTING WIRELESS FACILITY WITH THE ADDITION OF NEW GENERATOR & GROUND EQUIPMENT
01/31/2013
02/27/2013
08/26/2013

Locations

Property
0420331121

* Address
902 S MERIDIAN

Reviews

Review Type Outcome Est. Completion Date Completed
Fire Review VOID 12/09/2021
Fire Review Approved 02/18/2013
Building Review Approved 02/12/2013
Planning Review Approved 02/01/2013

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $321.25 $321.25 Paid 02/27/2013
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 02/27/2013
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/27/2013
No
Building Plan Review Fee $208.81 $208.81 Paid 01/31/2013
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Approved 5/17/2013 05/17/2013
Shannon King ((253) 840-6684)
Building Final Inspection VOID 12/09/2021
Gary Webster ((253) 841-5590)
Building Final Inspection VOID 7/24/2013 12/09/2021
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: FIRE: 1 THE INSTALLATION OF THE GENERATOR SHALL COMPLY WITH THE 2009 IFC AND NFPA 110 2005 EDITION AND THE STATE ELECTRICAL CODE. 2 TANK VENT PIPE TO BE A MINIMUM OF 12' ABOVE FINISH GRADE IFC 3404.2.7.3.3 3 INSTALL DIAMOND PLACARDING PER NFPA 704 ON STORAGE TANK AND A MINIMUM OF 1 ON THE EAST END OF THE ENCLOSURE. 4 PROVIDE "NO SMOKING WITHIN 25' " SIGNS ATTACHED TO THE OUTSIDE OF THE ENCLOSURE. 5 PROVIDE A MINIMUM OF 1 2A-20 BC FIRE EXTINGUISHER TO BE LOCATED NO LESS THAN 10' AND NO GREATER THAN 50' FROM THE DIESEL STORAGE TANK. 6. IVR-9200 FIRE FINAL BUILDING PERMIT INSPECTION REQUIRED
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.