Permit Application Status

B-13-0405


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-13-0405
Deck/Porch/Patio
Closed
CIOLLI KYLE
Other
BUILDING ROOF OVER PATIO
05/13/2013
05/22/2013
11/18/2013
06/24/2013

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 05/16/2013

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $70.75 $70.75 Paid 05/22/2013
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 05/22/2013
No
Planning Review Fee $45.99 $45.99 Paid 05/13/2013
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection Approved 06/20/2013
Monty Johnson ((253) 770-3326)
Frame Inspection Approved 6/20/2013 06/20/2013
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Engineering Residential Standard Conditions Resolved Engineering Division Standard Conditions
: **PRIOR to final inspection all rolled curb along property lines will be removed and replaced with vertical curb per City Standards** * The Applicant is responsible to call the Engineering Inspector at 253-405-1707 to schedule a side sewer inspection PRIOR to backfilling. * Curb, gutter, sidewalk and approach must be poured per City Standards. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a Right of Way permit. * Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage, per City Standards * Sanitary sewer clean-out to be installed at the property line. If located in the driveway area, it must be placed in a frame and covered, per City Standards. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Storm water runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards. * Property owner must install a private pump system per city standards to tie into existing force main. * All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA), per City Standards. * This property lies within a regulated Flood Zone (A1 - A30, AE); both residential and non-residential require the lowest floor, including the basement, be elevated 1- foot minimum above base flood elevation (BFE). * This property lies within the AO Flood Zone as defined by the August 15, 1980 Flood Insurance Rate Map: NEW RESIDENTIAL construction on this lot will require: that the lowest floor, including the basement, shall be elevated 1-foot minimum above the depth number on the Flood Insurance Rate Map (FIRM) (min. 2-feet above highest adjacent grade). (PMC 21.07.060(5a)) AND, The building site shall be filled to an elevation at least 1-foot above the crown of the highest adjacent public road for at least 15-feet beyond the perimeter around the house. NEW NON-RESIDENTIAL construction on this lot will require: that the lowest floor, including the basement, shall be elevated above the grade of the building site 1-foot minimum above the depth number on the Flood Insurance Rate Map (FIRM) (min. 2-feet above highest adjacent grade). (PMC 21.07.060(5b)) AND, The building site shall be filled to an elevation at least 1-foot above the crown of the highest adjacent public road for at least 15-feet beyond the perimeter around the house. Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1-foot above grade. (PMC 21.07.060(2)) Steps shall be taken to prevent drainage onto adjacent lots. No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Elevation Certificate is completed and submitted to the City of Puyallup.
Special Inspection Conditions Resolved Building Division Standard Conditions
: Notice of Moratorium The City of Puyallup has imposed a moratorium in RS, RM and PD zones with respect to what are commonly known as halfway houses for sex offenders, violent felons and felons that have been convicted of serious property crimes. The moratorium, which was adopted in Ordinance No. 3013, is as follows: A moratorium is hereby imposed in all of Puyallup's residential zones, to include RS, RM, and PD, with respect to the acceptance or processing of applications, or issuance of permits and approvals, and uses or activities associated with what are commonly known as halfway houses. For purposes of this ordinance, a "halfway house" shall include, but not be limited to, adult family homes, boarding homes, dwellings, residential care facilities, residential treatment facilities, and uses of a similar nature, at which two or more persons reside or congregate, when such persons have been found to have committed, or have been found not guilty by reason of insanity, or have been convicted of: a serious violent offense as defined in RCW 9.94A.030(45), a violent offense as defined in RCW 9.94A.030(54), a sex offense as defined in RCW 9.94A.030(46), or one of the following Class B felonies: Residential Burglary (9A.52.025) , Burglary 2 (9A.52.020), Malicious Mischief 1 (9A.48.070), and Theft 1 (9A.56.030). In accordance with the moratorium, please be aware that the City is prohibited from accepting or processing applications, or issuing permits or approvals for the above-identified halfway houses, and that the moratorium applies to uses or activities associated with halfway houses in RS, RM, and PD zones. I acknowledge that I have been notified about the moratorium in Ordinance No. 3013.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Mechanical and Plumbing OTC Conditions Resolved Building Division Standard Conditions
: REQUIRED INSPECTIONS INSPECTION INSPECTION Code Code 2110 FOOTING/SETBACK 9000 PLANNING FINAL BUILDING PERMIT 2115 FOUNDATION/REBAR 6205 SIDESEWER 2120 UNDERFLOOR 6405 STORM 2125 SLAB/INSULATION 6605 WATER 2210 ROOF SHEATHING 6705 FRONTAGE/DRIVEWAY 2215 SHEARWALL 9100 ENGINEERING FINAL BUILDING PERMIT 2230 ENERGY INSPECTION 9900 FINAL RESIDENTIAL 2235 FRAME 2240 COMBINATION FRAME AND ROUGH IN This is a general list, other inspections may be requried.
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.