Summary

B-13-0797
Commercial - New Construction
Closed
BCC PUYALLUP LLC
Other
TI ~ TRI WEST ~ BENAROYA BLDG A/B ~ WEST BLDG ~ 2ND FLOOR
10/07/2013
10/16/2013
07/05/2014
02/26/2014

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021
Engineering Review Approved 10/08/2013
Building Review Approved 10/08/2013

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 10/16/2013
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 10/16/2013
No
Building Permit Fee $4,112.50 $4,112.50 Paid 10/16/2013
No
Building Plan Review Fee $2,673.13 $2,673.13 Paid 10/07/2013
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection In Progress 11/8/2013 11/08/2013
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 11/13/2013 11/13/2013
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection In Progress 11/21/2013 11/21/2013
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Approved 11/26/2013 11/26/2013
Ray Cockerham ((253) 841-5585)
Exit Lighting Test Inspection Approved 11/27/2013
Ray Cockerham ((253) 841-5585)
Fire Final Inspection In Progress 11/27/2013
Ray Cockerham ((253) 841-5585)
Building Final Inspection In Progress 11/27/2013 11/27/2013
Ray Cockerham ((253) 841-5585)
Exit Lighting Test Inspection Approved 01/06/2014
Ray Cockerham ((253) 841-5585)
Fire Final Inspection Approved 02/07/2014
rfore
Building Final Inspection Approved 02/26/2014
rfore
Engineering Final Inspection VOID 12/09/2021
charris
Frame Inspection VOID 11/6/2013 12/09/2021
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 11/7/2013 12/09/2021
rfore
Ceiling Grid/T-Bar Inspection VOID 11/20/2013 12/09/2021
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 11/25/2013 12/09/2021
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: FIRE: PERMIT CONDITIONS: FIRE CODE OFFICIAL REVIEW: 1. SEPERATE FIRE SPRINKLER AND FIRE ALARM PERMITS ARE REQUIRED. 2. EMERGENCY EGRESS LIGHTING TEST REQUIRED 3. NO STORAGE IS ALLOWED WITHOUT PRIOR FIRE CODE OFFICIAL APPROVAL 4. FIRE FINAL INSPECTION IS REQUIRED AFTER L&I ELECTRICAL FINAL 5 IVR-9200 FIRE FINAL BUILDING PREMIT INSPECTION REQUIRED
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.