CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-14-0238


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-14-0238
Commercial - New Construction
Closed
GOOD SAM COMMUNITY HEALTHCARE
Other
TI - OSTENSON CANCER CTR/GSH B-14-0288 BUILD/PLUMB** BUILD ONLY
04/04/2014
05/09/2014
11/11/2014
11/18/2021

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 04/16/2014
Legacy Activity (see Comments) Approved 04/11/2014
Engineering Review Approved 04/09/2014

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 05/09/2014
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 05/09/2014
No
Building Permit Fee $1,301.75 $1,301.75 Paid 05/09/2014
No
Building Plan Review Fee $846.14 $846.14 Paid 04/04/2014
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection In Progress 5/13/2014 05/13/2014
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Approved 5/15/2014 05/15/2014
Shannon King ((253) 840-6684)
Building Final Inspection Approved 06/27/2014
rfore
Fire Final Inspection Approved 6/27/2014 06/27/2014
rfore
Comment Building Div Inspection VOID 6/26/2014 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 6/27/2014 12/09/2021
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington. DEPARTMENT OF HEALTH TO APPROVE FINAL CONSTRUCTION PLAN DETAILS IN REGARD TO THEIR REQUIREMENTS.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: FIRE: FIRE CODE OFFICIAL: 1. Any modifications to the fire alarm or fire sprinkler system shall require a seperate permit. 2. IVR- 9200 Fire Final Building Permit Inspection is required.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.