CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-14-0510


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-14-0510
Deck/Porch/Patio
Expired
KIZER KELLI K
Other
COVERED PATIO
07/07/2014
07/29/2014
01/25/2015

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021
Building Review Approved 07/23/2014
Planning Review Approved 07/17/2014
Engineering Review Approved 07/08/2014

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 07/29/2014
No
Planning Review Fee $30.00 $30.00 Paid 07/29/2014
No
Building Permit Fee $251.25 $251.25 Paid 07/29/2014
No
Planning Review Fee $163.31 $163.31 Paid 07/07/2014
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Approved 8/7/2014 08/07/2014
Shannon King ((253) 840-6684)
Carbon Monoxide Detectors Inspection VOID 12/09/2021
Legacy user
Frame Inspection VOID 12/09/2021
Legacy user
Comment Building Div Inspection VOID 12/09/2021
Legacy user
Foundation/Rebar Inspection VOID 12/09/2021
Legacy user
Frame Inspection VOID 12/09/2021
Shannon King ((253) 840-6684)
Frame Inspection VOID 12/09/2021
Legacy user
Building Final Inspection VOID 12/09/2021
Legacy user
Footing/Setback Inspection VOID 8/1/2014 12/09/2021
Shannon King ((253) 840-6684)
Frame Inspection VOID 10/17/2014 12/09/2021
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 3/23/2015 12/09/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 4/8/2015 12/09/2021
Shannon King ((253) 840-6684)
Building Final Inspection VOID 4/13/2015 12/09/2021
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Engineering Residential Standard Conditions Resolved Standard Conditions
Engineering Division
* The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Storm water runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Mechanical and Plumbing OTC Conditions Resolved Standard Conditions
Building Division
REQUIRED INSPECTIONS INSPECTION INSPECTION Code Code 2110 FOOTING/SETBACK 9000 PLANNING FINAL BUILDING PERMIT 2115 FOUNDATION/REBAR 6205 SIDESEWER 2120 UNDERFLOOR 6405 STORM 2125 SLAB/INSULATION 6605 WATER 2210 ROOF SHEATHING 6670 FRONTAGE/DRIVEWAY 2215 SHEARWALL 9100 ENGINEERING FINAL BUILDING PERMIT 2230 ENERGY INSPECTION 9900 FINAL RESIDENTIAL 2235 FRAME 2240 COMBINATION FRAME AND ROUGH IN 2925 COMMENT This is a general list, other inspections may be requried.
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.