CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-14-0601


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-14-0601
Commercial - New Construction
Closed
CITY OF PUYALLUP - CITY HALL
Other
TI ~ EDWARD JONES INVESTMENTS BLDG/PLUMB
08/04/2014
08/20/2014
03/29/2015
10/07/2014

Locations

Property
5745000960

Property
5745000971

Property
5745000972

Property
5745000981

Property
5745001000

Property
5745001060

Property
5745001070

Property
5745001080

* Address
333 S MERIDIAN

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 08/12/2014
Planning Review Approved 08/11/2014
Engineering Review Approved 08/06/2014

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 08/20/2014
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 08/20/2014
No
Building Permit Fee $678.75 $678.75 Paid 08/20/2014
No
Plumbing Plan Review Fee $34.45 $34.45 Paid 08/20/2014
No
Plumbing Permit Fee $53.00 $53.00 Paid 08/20/2014
No
Legacy Fee $37.50 $37.50 Paid 08/04/2014
No
Building Plan Review Fee $441.19 $441.19 Paid 08/04/2014
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection Approved 09/16/2014
Ray Cockerham ((253) 841-5585)
Frame Inspection In Progress 9/15/2014 09/16/2014
Ray Cockerham ((253) 841-5585)
Frame Inspection Approved 09/18/2014
Ray Cockerham ((253) 841-5585)
Wallboard / Drywall Inspection Approved 9/18/2014 09/18/2014
Ray Cockerham ((253) 841-5585)
Ceiling Grid/T-Bar Inspection In Progress 9/30/2014 09/30/2014
Ray Cockerham ((253) 841-5585)
Fire Final Inspection Approved 10/07/2014
Ray Cockerham ((253) 841-5585)
Ceiling Grid/T-Bar Inspection Approved 10/2/2014 10/07/2014
Ray Cockerham ((253) 841-5585)
Building Final Inspection Approved 10/3/2014 10/6/2014 10/07/2014
Ray Cockerham ((253) 841-5585)
Building Final Inspection VOID 10/3/2014 12/09/2021
Ray Cockerham ((253) 841-5585)

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Building Permit Standard Conditions Resolved Standard Conditions
Building Division
PERMIT CONDITIONS: FIRE: 1 A MINIMUM OF (1) 2A-10BC FIRE EXTINGUISHER SHALL BE REQUIRED 2 A SEPERATE FIRE SPRINKLER PERMIT SHALL BE REQUIRED 3 A SEPERATE FIRE ALARM PERMIT MEETING NFPA 72 "TOTAL COVERAGE" SHALL BE REQUIRED 4 IVR-9200 FIRE FINAL BUILDING PERMIT INSPECTION REQUIRED BUILDING NOTES: BUILDING AND PLUMBING INCLUDED SEPARATE ELECTRICAL APPROVAL AND INSPECTION BY LABOR AND INDUSTRIES SEPARATE MECHANICAL PERMIT REQUIRED - PRELIMINARY COMMISSIONING REVIEW AND SEAL ALL PENTRATIONS AT HALLWAY WALL
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.