Summary

B-15-0107
Commercial - New Construction
Closed
FARRIS RICHARD A & KATHY L
Other
CLOSE IN EXISTING COVERED PORCH ~ FARRIS VET CLINIC
02/17/2015
03/16/2015
04/20/2016
02/02/2016

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 03/13/2015
Building Review Approved 02/19/2015
Engineering Review Approved 02/18/2015

Fees

Paid Fees Amount Paid Owing Date Paid
Mechanical Plan Review Fee $35.17 $35.17 Paid 03/16/2015
No
Planning Building Permit Fee $30.00 $30.00 Paid 03/16/2015
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 03/16/2015
No
Mechanical Permit Fee $54.10 $54.10 Paid 03/16/2015
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/16/2015
No
Building Permit Fee $70.75 $70.75 Paid 03/16/2015
No
Planning Landscape Review Fee $90.00 $90.00 Paid 03/16/2015
No
Building Plan Review Fee $45.99 $45.99 Paid 02/17/2015
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection Approved 8/27/2015 08/27/2015
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Approved 10/23/2015
Shannon King ((253) 840-6684)
Building Final Inspection Approved 2/2/2016 02/02/2016
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 4/14/2015 12/09/2021
Shannon King ((253) 840-6684)
Frame Inspection VOID 7/30/2015 12/09/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 11/6/2015 12/09/2021
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Engineering Residential Standard Conditions Resolved Standard Conditions
Engineering Division
* The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Storm water runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Standard Conditions
Building Division
PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.