CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-15-0557


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-15-0557
Commercial - New Construction
Expired
Other
RELOCATE PLUMB DRAN;ADD DRYER DUCT TO EXTERIOR - PIERCE COLLEGE/HEALTH EDUCATION CTR
06/08/2015
06/12/2015
12/12/2015

Locations

Property
0419023011

Property
0419023012

Property
0419023013

Property
0419034013

Property
0419034018

Address
1601 39TH AVE SE, PUYALLUP, WA 98374

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 06/10/2015
Building Review Approved 06/09/2015

Fees

Paid Fees Amount Paid Owing Date Paid
Mechanical Permit Fee $49.60 $49.60 Paid 06/12/2015
No
Mechanical Plan Review Fee $32.24 $32.24 Paid 06/12/2015
No
Plumbing Permit Fee $53.00 $53.00 Paid 06/12/2015
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 06/12/2015
No
Plumbing Plan Review Fee $34.45 $34.45 Paid 06/12/2015
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection VOID 12/09/2021
Legacy user
Mechanical Final Inspection VOID 12/09/2021
Legacy user
Plumbing Rough In Inspection VOID 12/09/2021
Legacy user
Fire Final Inspection VOID 12/09/2021
Legacy user
Mechanical Rough In Inspection VOID 12/09/2021
Legacy user
Comment Building Div Inspection VOID 12/09/2021
Legacy user
Ceiling Grid/T-Bar Inspection VOID 12/09/2021
Legacy user
Plumbing Final Inspection VOID 12/09/2021
Legacy user
Mechanical Final Inspection VOID 6/15/2015 12/09/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection VOID 6/15/2015 12/09/2021
Shannon King ((253) 840-6684)
Fire Final Inspection VOID 9/15/2015 12/09/2021
rfore
Mechanical Final Inspection VOID 9/15/2015 12/09/2021
Shannon King ((253) 840-6684)
Plumbing Final Inspection VOID 9/15/2015 12/09/2021
Shannon King ((253) 840-6684)
Building Final Inspection VOID 9/15/2015 12/09/2021
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.