Summary

B-16-0137
Commercial - New Construction
Closed
SOUND PROPERTIES LLC
Other
TI ~ PLANET FITNESS BLDG/MECH/PLUMB
02/18/2016
05/09/2016
02/01/2017
09/07/2016

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021
Building Review Approved 05/03/2016
Planning Review Approved 03/03/2016
Engineering Review Approved 02/23/2016

Fees

Paid Fees Amount Paid Owing Date Paid
Legacy Fee $390.00 $390.00 Paid 08/05/2016
No
Building Re-Inspection Fee $390.00 $390.00 Paid 08/02/2016
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 05/09/2016
No
Legacy Fee $75.00 $75.00 Paid 05/09/2016
No
Mechanical Plan Review Fee $100.69 $100.69 Paid 05/09/2016
No
Planning Building Permit Fee $120.00 $120.00 Paid 05/09/2016
No
Mechanical Permit Fee $154.90 $154.90 Paid 05/09/2016
No
Building Permit Fee $2,393.75 $2,393.75 Paid 05/09/2016
No
Sewer System Development Charge $30,586.84 $30,586.84 Paid 05/09/2016
No
Building Division Fee (Hourly) $260.00 $260.00 Paid 05/09/2016
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 05/09/2016
No
Plumbing Plan Review Fee $431.60 $431.60 Paid 05/09/2016
No
Plumbing Permit Fee $664.00 $664.00 Paid 05/09/2016
No
Planning Landscape Review Fee $300.00 $300.00 Paid 05/09/2016
No
Water System Development Charge $14,050.57 $14,050.57 Paid 05/09/2016
No
Building Plan Review Fee $1,555.94 $1,555.94 Paid 02/18/2016
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection In Progress 5/17/2016 05/17/2016
rfore
Frame Inspection In Progress 6/1/2016 06/01/2016
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 6/7/2016 06/07/2016
Eric Tague ((253) 864-4192)
Wallboard / Drywall Inspection In Progress 6/16/2016 06/16/2016
rfore
Plumbing Rough In Inspection In Progress 6/17/2016 06/17/2016
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection In Progress 6/17/2016 06/17/2016
Shannon King ((253) 840-6684)
Frame Inspection In Progress 6/20/2016 06/20/2016
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Approved 6/20/2016 06/20/2016
Shannon King ((253) 840-6684)
Frame Inspection In Progress 6/23/2016 06/23/2016
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection In Progress 6/23/2016 06/23/2016
Shannon King ((253) 840-6684)
Frame Inspection In Progress 6/27/2016 06/27/2016
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection In Progress 6/27/2016 06/27/2016
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection In Progress 7/1/2016 07/01/2016
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection In Progress 7/25/2016 07/25/2016
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection In Progress 07/30/2016
Shannon King ((253) 840-6684)
Gas Test Inspection Approved 07/30/2016
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Approved 08/04/2016
Shannon King ((253) 840-6684)
Building Final Inspection Approved 8/5/2016 08/05/2016
rfore
Fire Final Inspection Approved 8/5/2016 08/05/2016
rfore
Exit Lighting Test Inspection Approved 8/4/2016 8/5/2016 08/05/2016
rfore
Frame Inspection VOID 6/14/2016 12/09/2021
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 6/15/2016 12/09/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection VOID 6/16/2016 12/09/2021
rfore
Mechanical Rough In Inspection VOID 7/28/2016 12/09/2021
Shannon King ((253) 840-6684)
Gas Test Inspection VOID 7/28/2016 12/09/2021
Shannon King ((253) 840-6684)
Gas Test Inspection VOID 7/29/2016 12/09/2021
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 7/29/2016 12/09/2021
Shannon King ((253) 840-6684)
Exit Lighting Test Inspection VOID 8/4/2016 12/09/2021
rfore
Fire Final Inspection VOID 8/4/2016 12/09/2021
rfore
Building Final Inspection VOID 8/4/2016 12/09/2021
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. Permits expire 2 years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Building Permit Standard Conditions Resolved Standard Conditions
Building Division
PERMIT CONDITIONS: FIRE: 1. ANY MODIFICATION TO THE FIRE ALARM OR SPRINKLER SYSTEM SHALL REQUIRE A SEPERATE PERMIT. 2. PUYALLUP MUNICIPAL CODE REQUIRES "TOTAL COVERAGE" PER NFPA 72. 3. PUYALLUP MUNICIPAL CODE REQUIRES UL CERTIFICATION ON NEW FIRE ALARM SYSTEMS. 4. SEISMIC CALCULATIONS SHALL BE REQUIRED ON THE NEW AND EXISTING FIRE SPRINKLER SYSTEM. 5. AN EMERGENCY EGRESS LIGHTING TEST SHALL BE REQUIRED PRIOR TO TCO OR FINAL OCCUPANCY. THE TEST SHALL BE CONDUCTED AFTER ALL EXCERCISE EQUIPTMENT IS INSTALLED. COMPLY WITH IFC 2012 EDITION SECTION 1006. REQUIRED INSPECTIONS: 1 IVR-2252 EMERGENCY EGRESS LIGHTING TEST 2 IVR-9200 FIRE FINAL BUILDING PREMIT INSPECTION ENGINEERING: Please note on page P1.2 note 2 of Bass Bid that "connection to or construction of this line is not permitted under this permit". Prior to occupancy the water service being provided to this tenent will be protected by the installation of an Reduced Pressure Backflow Assembly.
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.