Summary

B-16-0300
Commercial - New Construction
Closed
CITY OF PUYALLUP S. CARSTENS, P.E.
Other
PREMISES ISOLATION BLDG/WPCP BLDG/PLUMB
04/08/2016
05/03/2016
10/30/2016
01/14/2020

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review VOID 12/09/2021
Planning Review VOID 12/09/2021
Engineering Traffic Review Approved 04/18/2016
Fire Review Approved 04/12/2016
Building Review Approved 04/12/2016

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 04/22/2016
No
Building Plan Review Fee $755.14 $755.14 Paid 04/22/2016
No
Plumbing Plan Review Fee $42.90 $42.90 Paid 04/22/2016
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 04/22/2016
No
Plumbing Permit Fee $66.00 $66.00 Paid 04/22/2016
No
Building Permit Fee $1,161.75 $1,161.75 Paid 04/22/2016
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection In Progress 5/4/2016 05/04/2016
Shannon King ((253) 840-6684)
Building Final Inspection Approved 08/30/2016
Ray Cockerham ((253) 841-5585)
Engineering Final Inspection VOID 12/09/2021
lesley

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. Permits expire 2 years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington. **PLANNING - The revision shows the proposed building to be less than 200 square feet, therefore, the structure is exempt from setbacks. However, the proposed location for the building will remove existing landscaping; coordinate with planning regarding replacement of perimeter landscaping.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.