CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-17-0074


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-17-0074
Commercial - Tenant Improvement/Remodel
Closed
CAFARO NORTHWEST PARTNERSHIP
Alteration/Remodel
SHELL FOR FUTURE H & M STORE ~ SPACE #940 SEE B-17-0110 ~ MECH AC UNITS ON TI PERMIT BLDG ONLY
02/01/2017
03/20/2017
10/22/2017
06/21/2017

Locations

Property
6021010051

Property
6021590070

Property
6021590090

* Address
3500 S MERIDIAN

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021
Building Review Approved 03/15/2017
Engineering Review Approved 02/03/2017

Fees

Paid Fees Amount Paid Owing Date Paid
Legacy Fee $75.00 $75.00 Paid 03/20/2017
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/14/2017
No
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 02/14/2017
No
Mechanical Permit Fee $118.20 $118.20 Paid 02/14/2017
No
Mechanical Plan Review Fee $76.83 $76.83 Paid 02/14/2017
No
Building Permit Fee $1,710.55 $1,710.55 Paid 02/14/2017
No
Building Plan Review Fee $1,111.86 $1,111.86 Paid 02/01/2017
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Fire Final Inspection Approved 4/27/2017 04/27/2017
Ray Cockerham ((253) 841-5585)
Building Final Inspection Approved 06/21/2017
drathke
Comment Building Div Inspection VOID 4/24/2017 12/09/2021
drathke
Mechanical Final Inspection VOID 4/25/2017 12/09/2021
drathke
Building Final Inspection VOID 5/2/2017 12/09/2021
drathke
Building Final Inspection VOID 5/8/2017 12/09/2021
drathke

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. *Work shall not proceed until the inspector has approved the stages of construction. *Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct: that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Once work has started (passed a required inspection) one inspection per year must be completed to keep active or it will formally expire and become null and void. Permits expire 2 years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the state of Washington.
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: FIRE: 1. ANY MODIFICATION TO THE FIRE ALARM OR FIRE SPRINKLER SYSTEM SHALL REQUIRE A SEPERATE PERMIT. 2. IVR-9200 FIRE FINAL BUILDING PERMIT INSPECTION REQUIRED.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.