Summary

B-17-0869
Re-Roof
Expired
WASHINGTON COLD STORAGE INC
Other
ROOF REPLACEMENT EAST/WEST ~ WASHINGTON COLD STORAGE
10/06/2017
10/06/2017
04/04/2018

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 10/06/2017
Building Review Approved 10/06/2017

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 10/06/2017
No
Building Plan Review Fee $538.24 $538.24 Paid 10/06/2017
No
Building Permit Fee $825.75 $825.75 Paid 10/06/2017
No
Permit Investigation Fee $825.75 $825.75 Paid 10/06/2017
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection VOID 12/10/2021
Legacy user
Roof Sheathing Inspection VOID 12/10/2021
Legacy user
Re-Roof Inspection VOID 12/10/2021
Legacy user
Pre-Construction Building Inspection VOID 12/10/2021
Legacy user
Comment Building Div Inspection VOID 12/10/2021
Legacy user
Frame Inspection VOID 12/10/2021
Legacy user
Building Final Inspection VOID 12/10/2021
Legacy user

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/ 1) INSTALLATION SHALL MEET THE REQUIREMENTS OF THE 2015 END EDITION OF THE WASHINGTON STATE COMMERCIAL ENERGY CODE. 2) MANUFACTURE REPRESENTATIVE SHALL PROVIDE INSTALLATION INSPECTION REPORTS AND FINAL ACCEPTANCE LETTER FOR THE INSTALLED PRODUCT(S).
Re-Roof Conditions Resolved Building Division Standard Conditions
: RE-ROOF 1) PROVIDE MANUFACTURES SPECIFICATIONS AND INSTALLATION DETAILS ON SITE FOR INSPECTION 2) CALL FOR REQUIRED INSPECTIONS PRIOR TO COVER; REQUIRED FOR SHEATHING REPLACEMENT, STRUCTURAL REPAIR OR INSULATION 3) PROVIDE INSPECTION ACCESS 4) PROVIDE A COPY OF THE PERMIT ON SITE ***MUST PROVIDE DRIP EDGE ON ALL ROOF EDGES*** ACTION CODES (REQUIRED FOR REQUESTING INSPECTIONS) 2210 ROOF SHEATHING 2255 RE-ROOF 2235 FRAME 2925 COMMENT 9900 RESIDENTIAL FINAL 9800 COMMERCIAL FINAL

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.