CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-17-0889


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-17-0889
UNKOWN LEGACY PERMIT TYPE
Closed
GOOD SAMARITIAN HOSPITAL
Other
ADDING SEISMIC (2) FLOORS ~ DALLY TOWERS
10/11/2017
04/02/2018
09/29/2018
04/02/2018

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021

Fees

There are no fees for this permit application, or you are not authorized to view them.

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: Clarks Creek Elodea (DASH) Project Contract Work: The provision of goods and services identified in the Contract constitute the Contract Work. Contractor shall perform the Contract Work pursuant to the terms of the Contract. Contractor shall furnish all labor, materials, equipment, tools, transportation, services, appliances, and appurtenances for the Contract Work in strict conformity with this Contract, within the time-period prescribed by the City. ***FLOOD ZONE - NO*** ***APPROVED TRAFFIC CONTROL PLAN (TCP) IF REQUIRED*** Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. CALL BEFORE YOU DIG - IT'S THE LAW. I hereby acknowledge that I have read and understand the contents of this permit.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.