Permit Application Status

B-17-0897


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-17-0897
Sign/Awning
Closed
PUYALLUP SCHOOL DIST NO 3
Other
POLE SIGN (1) ~ PUYALLUP SCHOOL DISTRICT SUPPORT CAMPUS
10/13/2017
01/02/2018
08/05/2018
02/06/2018

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 12/20/2017
Building Review Approved 11/15/2017
Planning Review Approved 10/19/2017

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 01/02/2018
No
Building Permit Fee $391.25 $391.25 Paid 01/02/2018
No
Building Plan Review Fee $254.31 $254.31 Paid 10/13/2017
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Sign Footing Inspection Approved 1/22/2018 01/22/2018
Gary Webster ((253) 841-5590)
Sign Final Inspection Approved 2/6/2018 02/06/2018
Shannon King ((253) 840-6684)
Sign Footing Inspection VOID 1/16/2018 12/09/2021
Gary Webster ((253) 841-5590)
Sign Final Inspection VOID 1/31/2018 12/09/2021
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: Clarks Creek Elodea (DASH) Project Contract Work: The provision of goods and services identified in the Contract constitute the Contract Work. Contractor shall perform the Contract Work pursuant to the terms of the Contract. Contractor shall furnish all labor, materials, equipment, tools, transportation, services, appliances, and appurtenances for the Contract Work in strict conformity with this Contract, within the time-period prescribed by the City. ***FLOOD ZONE - NO*** ***APPROVED TRAFFIC CONTROL PLAN (TCP) IF REQUIRED*** Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. CALL BEFORE YOU DIG - IT'S THE LAW. I hereby acknowledge that I have read and understand the contents of this permit. ** A minimum distance between the proposed pole sign and the onsite driveway of 27' (feet) is required ** *** Call before you dig @ 811
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.