Summary

B-18-0156
Demolition
Closed
MULTICARE HEALTH SYSTEM
Demolition
DEMO MULTICARE GOOD SAMARITAN DAYCARE (see attached email regarding different address on building)
02/23/2018
05/25/2018
11/21/2018
09/09/2019

Locations

Property
7080000182

* Address
1403 5TH ST SE

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021
Engineering Review Approved 04/11/2018
Building Review Approved 04/02/2018
Planning Review Approved 03/01/2018
Fire Review Approved 02/23/2018

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $4.50 $4.50 Paid 05/25/2018
No
Demo Sewer Service Fee $30.00 $30.00 Paid 05/25/2018
No
Legacy Fee $982.00 $982.00 Paid 05/25/2018
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Final Inspection Approved 09/03/2019
Marcus Sedlickas ((253) 405-1707)
Building Final Inspection Approved 9/9/2019 09/09/2019
Gary Webster ((253) 841-5590)

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Demolition Standard Conditions Resolved Standard Conditions
Engineering Division
** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE COTROLLED TO REDUCE EROSION AND SEDIMEMT LOSS DURING THE PERMIOD OF EXPOSURE. * I agree to call the Utility Notification Center at 1-800-424-5555 (811) before beginning any excavation. Call before you dig, it's the law. * I agree to cut and cap the sanitary sidesewer at property line. The existing sidesewer shall not be re-used. Call the inspection line at 253-445-4795 or 253-445-5092 to schedule this inspection PRIOR to backfilling. Enter the action code 9100 when prompted. * The City water division shall perform the water service removal. Contact Perry Baird at 253-841-5512 to schedule. * I agree to call the inspection line at 253-445-4795 or 253-445-5092 to schedule a building final inspection. Enter action code 9800 when prompted for Building Inspection Final. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Building Permit Standard Conditions Resolved Standard Conditions
Building Division
PERMIT CONDITIONS: Puget Sound Clean Air Agency Notification required prior to begining demolition - http://www.pscleanair.org/185/Asbestos 1) Engineering final required prior to building final. 2) Call for building final after completing site clean-up of all debri and final grading is complete. Must comply will all State and local requirments for construction sites.
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.