CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-18-0578


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-18-0578
Commercial - New Construction
Canceled
CITY OF PUYALLUP - CITY HALL
Other
CONCRETE SLAB & EXTERIOR METAL STAIRWAY
07/02/2018
12/29/2018
11/12/2019

Locations

Property
5745000960

Property
5745000971

Property
5745000972

Property
5745000981

Property
5745001000

Property
5745001060

Property
5745001070

Property
5745001080

Property
5745001090

* Address
333 S MERIDIAN

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021
Building Review VOID 12/09/2021
Engineering Review Approved 09/13/2018
Planning Review Approved 08/23/2018
Fire Review Approved 07/05/2018

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $245.21 $245.21 Paid 07/03/2018
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Ceiling Grid/T-Bar Inspection VOID 12/09/2021
Legacy user
Frame Inspection VOID 12/09/2021
Legacy user
Mechanical Rough In Inspection VOID 12/09/2021
Legacy user
Plumbing Rough In Inspection VOID 12/09/2021
Legacy user
Building Final Inspection VOID 12/09/2021
Legacy user
Combination Frame And Rough In Inspection VOID 12/09/2021
Legacy user
Comment Building Div Inspection VOID 12/09/2021
Legacy user
Footing/Setback Inspection VOID 12/09/2021
Legacy user
Mechanical Final Inspection VOID 12/09/2021
Legacy user
Carbon Monoxide Detectors Inspection VOID 12/09/2021
Legacy user
Foundation/Rebar Inspection VOID 12/09/2021
Legacy user
Fire Final Inspection VOID 12/09/2021
Legacy user
Energy (Insulation) Inspection VOID 12/09/2021
Legacy user
Plumbing Final Inspection VOID 12/09/2021
Legacy user
Planning Final Inspection VOID 12/09/2021
Legacy user
Engineering Final Inspection VOID 12/09/2021
Legacy user
Wallboard / Drywall Inspection VOID 12/09/2021
Legacy user
Shear Wall Inspection VOID 12/09/2021
Legacy user

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Engineering Commercial Standard Conditions Resolved Standard Conditions
Engineering Division
* THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE COTROLLED TO REDUCE EROSION AND SEDIMEMT LOSS DURING THE PERMIOD OF EXPOSURE. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Storm water runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Standard Conditions
Building Division
PERMIT CONDITIONS: Comply with 2015 IFC AND IBC
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.