CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-19-0070


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-19-0070
Commercial - Tenant Improvement/Remodel
Expired
GOOD SAMARITIAN HOSPITAL
Alteration/Remodel
RETROFIT OF PATIENT LIFTS IN 22 ROOMS - (20) DALLY TOWER (2) REHAB BASEMENT LEVEL
01/30/2019
02/28/2019
08/04/2019

Locations

Property
9810000015

* Address
407 14TH AVE SE

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 02/04/2019
Fire Review Approved 01/31/2019

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 02/28/2019
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/28/2019
No
Building Permit Fee $1,766.55 $1,766.55 Paid 02/28/2019
No
Building Plan Review Fee $1,148.26 $1,148.26 Paid 01/30/2019
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection In Progress 3/26/2019 03/26/2019
Gary Webster ((253) 841-5590)
Building Final Inspection In Progress 3/28/2019 03/28/2019
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 4/1/2019 04/01/2019
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 4/4/2019 04/04/2019
Gary Webster ((253) 841-5590)
Building Final Inspection In Progress 4/9/2019 04/09/2019
Gary Webster ((253) 841-5590)
Building Final Inspection In Progress 4/11/2019 04/11/2019
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 4/15/2019 04/15/2019
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 4/17/2019 04/17/2019
Gary Webster ((253) 841-5590)
Building Final Inspection In Progress 4/22/2019 04/22/2019
Gary Webster ((253) 841-5590)
Building Final Inspection In Progress 4/24/2019 04/24/2019
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 4/26/2019 04/26/2019
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 5/1/2019 05/01/2019
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 5/20/2019 05/20/2019
Gary Webster ((253) 841-5590)
Fire Final Inspection Approved 6/3/2019 06/04/2019
David Drake ((253) 864-4171)
Building Final Inspection Approved 6/4/2019 06/04/2019
David Drake ((253) 864-4171)
Combination Frame And Rough In Inspection VOID 12/10/2021
Legacy user
Comment Building Div Inspection VOID 12/10/2021
Legacy user
Frame Inspection VOID 12/10/2021
Legacy user
Ceiling Grid/T-Bar Inspection VOID 12/10/2021
Legacy user

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/ ****NEED TO HAVE THE DEPARTMENT OF HEALTH APPROVAL PRIOR TO FINAL****
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATIO SYSTEM YOU MAY CHOOSE TO FOLLOW. FOR ANY QUESTIONS CALL MARCUS SEDLICKAS, ENGINEERING INSPECTOR, AT 253-405-1707 ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE COTROLLED TO REDUCE EROSION AND SEDIMEMT LOSS DURING THE PERMIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Storm water runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03. * All commercial developments, irrigation systems and multi family water service connections shall be protected by at reduced pressure backflow assembly (RPBA), as directed by the City, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District conforming to City Standard Details 03.04.02-1, 03.04.02-2 and 03.04.03. * A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards. * Property owner must install a private pump system per city standards to tie into existing force main. * All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA), per City Standards. * This property lies within a regulated Flood Zone (A1 - A30, AE); both residential and non-residential require the lowest floor, including the basement, be elevated 1- foot minimum above base flood elevation (BFE). * This property lies within the AO Flood Zone as defined by the August 15, 1980 Flood Insurance Rate Map: NEW COMMERCIAL construction on this lot will require: that the lowest floor, including the basement, shall be elevated above the grade of the building site 1-foot minimum above the depth number on the Flood Insurance Rate Map (FIRM) (min. 2-feet above highest adjacent grade). (PMC 21.07.060(5b)) AND, The building site shall be filled to an elevation at least 1-foot above the crown of the highest adjacent public road for at least 15-feet beyond the perimeter around the structure. Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1-foot above grade. (PMC 21.07.060(2)) Steps shall be taken to prevent drainage onto adjacent lots. No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Elevation Certificate is completed and submitted to the City of Puyallup.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3- A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED 4- PATIENT LIFTS SHALL NOT BLOCK SPRINKER HEADS. A FIRE SPRINKLER DESIGNER WILL NEED TO DETERMINE IF A HEAD CAN BE MOVED OR RELOCATED. IN THIS EVENT A PERMIT WILL BE REQUIRED. 5- FIRE EXTINGUISHERS REQUIRED PER CODE 6- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL INSPECTION REQUEST CODES: 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8PM TO SET UP A TIME. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.