CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-19-0174


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-19-0174
Mechanical - COMMERCIAL ONLY
Closed
MULTICARE HEALTH SYSTEM C/O LOREDANA IONESCU
New
GSH ~ COMBINED HEAT AND POWER PLANT
03/06/2019
06/12/2019
08/21/2023
02/22/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 06/10/2019
Building Review Incomplete 05/23/2019
Engineering Review Approved 05/20/2019
Fire Review Approved 04/30/2019
Planning Review Approved 04/04/2019

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 06/11/2019
No
Planning Building Permit Fee $120.00 $120.00 Paid 06/11/2019
No
Mechanical Permit Fee $192.78 $192.78 Paid 06/11/2019
No
Mechanical Plan Review Fee $125.31 $125.31 Paid 06/11/2019
No
Storm System Development Charge $520.13 $520.13 Paid 06/11/2019
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 06/11/2019
No
Planning Landscape Review Fee $300.00 $300.00 Paid 06/11/2019
No
Building Permit Fee $14,733.75 $14,733.75 Paid 06/11/2019
No
Building Plan Review Fee $9,576.94 $9,576.94 Paid 03/27/2019
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Mechanical Rough In Inspection In Progress 6/13/2019 06/13/2019
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection In Progress 6/27/2019 06/27/2019
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 7/2/2019 07/02/2019
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 7/29/2019 07/29/2019
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 9/6/2019 09/06/2019
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection In Progress 10/1/2019 10/01/2019
Gary Webster ((253) 841-5590)
Mechanical Rough In Inspection In Progress 10/17/2019 10/17/2019
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection Failed 12/4/2019 12/04/2019
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Approved 1/27/2020 01/27/2020
Gary Webster ((253) 841-5590)
Comment Building Div Inspection Comments 07/01/2021
Ray Cockerham ((253) 841-5585)
Comment Building Div Inspection In Progress 10/11/2021
Ray Cockerham ((253) 841-5585)
Planning Final Inspection VOID 5/26/2022 06/03/2022
Chris Beale ((253) 841-5418)
Fire Final Inspection Failed 5/26/2022 5/27/2022 06/06/2022
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
06/08/2022
1) Fire Sprinklers are required under the walkway above the project area per NFPA 13 -8.15.7.1 where the addition of the equipment under the walkway changes the exempt status. Unless the requirements of 8.15.7.2, 8.15.7.3, or 8.15.7.4 are met, sprinklers shall be installed under exterior projections exceeding 4 ft (1.2 m) in width. 2) Suppression system; Please verify that either A) the capacity of the suppression system works for the area with the dampers open OR B) The dampers close upon activation of the suppression system. Provide test reports verifying operations.

Building Final Inspection Failed 5/26/2022 5/26/2022 06/06/2022
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
06/06/2022
Final Inspection notes: 1)Final Letter from the Special Inspector. Provided April 7, 2020 Mayes Testing Paul Davis 2) Inspection report from the fabricator for the equipment enclosure. Provided dated March 28, 2022 from Kevin Rohrer, Martin Energy Group - manufacturer. 3) Confirm Electrical approval. 4) DOH email May 17, 2022; approval to proceed.

Mechanical Final Inspection Failed 5/26/2022 5/26/2022 06/09/2022
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
06/09/2022
1) See fire final notes regarding damper questions. 2) Affidavit for gas pipe per 12-4-19 inspection. GAS PIPE OUTSIDE OF EQUIPMENT ROOM AND ABOVE GENERATOR Boiler Tag by LnI 03349-19W

Building Final Inspection Failed 02/22/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
02/22/2023
Final Inspection notes: 1)Final Letter from the Special Inspector. Provided April 7, 2020 Mayes Testing Paul Davis 2) Inspection report from the fabricator for the equipment enclosure. Provided dated March 28, 2022 from Kevin Rohrer, Martin Energy Group - manufacturer. 3) Confirm Electrical approval. 4) DOH email May 17, 2022; approval to proceed.

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW. FOR ANY QUESTIONS CALL MARCUS SEDLICKAS, ENGINEERING INSPECTOR, AT 253-405-1707 ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. PLEASE SEE CITY STANDARDS 02.03.02 AND 05.02.01, WHICH ARE ATTACHED TO THE PERMIT. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- SEPARATE PERMITS ARE REQUIRED FOR FIRE ALARM AND FIRE SRPINKLER 3- FIRE ALARM TO BE TIED TO HOSPITAL FACP 4- FIRE EXTINGUISHERS REQUIRED PER CODE 5- TESTING AND COMMISIONING TO BE PERFORMED IN FRONT OF FIRE INSPECTOR 6- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL INSPECTION REQUEST CODES: 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8PM TO SET UP A TIME. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585 Gas piping tests and inspections required for service lines that are beyond the gas meter. Engineering Final Letters are required for all design professionals, including but not limited to structural, mechanical, electrical. All other environmental agency approval shall be sought by the contractor prior to requesting building final inspection.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
11/06/2022 Letter Permit Expiration Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.