CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-19-0452


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-19-0452
Commercial - New Construction
Expired
BCC PUYALLUP LLC
Other
BUILD SINGLE OCCUPANT RESTROOM ~ DATA CTR/BENAROYA **2021 SDC FEES UPDATED** BLDG/PLUMB/MECH
05/21/2019
12/28/2019

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 06/27/2019
Building Review Approved 05/24/2019
Fire Review Approved 05/24/2019
Building Review Incomplete 05/23/2019

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $287.46 $287.46 Paid 05/21/2019
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Wallboard / Drywall Inspection VOID 12/10/2021
Legacy user
Engineering Final Inspection VOID 12/10/2021
Legacy user
Plumbing Below Slab Inspection VOID 12/10/2021
Legacy user
Energy (Insulation) Inspection VOID 12/10/2021
Legacy user
Mechanical Rough In Inspection VOID 12/10/2021
Legacy user
Planning Final Inspection VOID 12/10/2021
Legacy user
Building Final Inspection VOID 12/10/2021
Legacy user
Mechanical Final Inspection VOID 12/10/2021
Legacy user
Combination Frame And Rough In Inspection VOID 12/10/2021
Legacy user
Plumbing Rough In Inspection VOID 12/10/2021
Legacy user
Frame Inspection VOID 12/10/2021
Legacy user
Comment Building Div Inspection VOID 12/10/2021
Legacy user
Carbon Monoxide Detectors Inspection VOID 12/10/2021
Legacy user
Plumbing Final Inspection VOID 12/10/2021
Legacy user

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Open Building Division Standard Conditions
: PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Open Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.