CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-20-0061


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-20-0061
Commercial - Tenant Improvement/Remodel
Expired
BCC PUYALLUP LLC
Alteration/Remodel
TI ~ COMCAST, STE #100 BLDG C TCO - ATTACHED BLDG/MECH/PLUMB
01/23/2020
03/06/2020
08/21/2021

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 05/04/2020 05/04/2020
Engineering Review Approved 01/23/2020 03/03/2020
Building Review Approved 02/21/2020 02/29/2020
Building Review Incomplete 01/23/2020 02/21/2020
Planning Review Approved 01/23/2020 02/05/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Mechanical Plan Review Fee $382.17 $382.17 Paid 03/06/2020
No
Plumbing Permit Fee $158.25 $158.25 Paid 03/06/2020
No
Mechanical Permit Fee $587.95 $587.95 Paid 03/06/2020
No
Plumbing Plan Review Fee $102.86 $102.86 Paid 03/06/2020
No
Planning Building Permit Fee $120.00 $120.00 Paid 03/06/2020
No
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 03/06/2020
No
Planning Landscape Review Fee $300.00 $300.00 Paid 03/06/2020
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/06/2020
No
Building Permit Fee $11,996.25 $11,996.25 Paid 03/06/2020
No
Building Plan Review Fee $7,797.56 $7,797.56 Paid 01/23/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection In Progress 3/10/2020 03/10/2020
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 04/17/2020
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Comments 4/17/2020 04/17/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection Comments 4/22/2020 04/23/2020
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 4/22/2020 04/23/2020
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 4/23/2020 04/23/2020
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection In Progress 4/23/2020 04/23/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 4/30/2020 04/30/2020
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 5/1/2020 05/01/2020
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 5/5/2020 05/05/2020
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 5/7/2020 05/07/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 05/11/2020
Gary Webster ((253) 841-5590)
Frame Inspection Comments 5/11/2020 05/11/2020
Gary Webster ((253) 841-5590)
Wallboard / Drywall Inspection In Progress 05/13/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 5/15/2020 05/15/2020
Monty Johnson ((253) 770-3326)
Frame Inspection Not Ready 5/15/2020 05/15/2020
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Not Ready 5/15/2020 05/15/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 5/19/2020 05/19/2020
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 5/19/2020 05/19/2020
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Comments 5/20/2020 05/20/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 5/22/2020 05/22/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 5/29/2020 05/29/2020
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 6/5/2020 06/05/2020
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 6/12/2020 06/12/2020
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 6/15/2020 06/15/2020
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Comments 6/16/2020 06/16/2020
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Failed 7/1/2020 07/01/2020
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Comments 7/2/2020 07/02/2020
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection Comments 7/2/2020 07/02/2020
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection In Progress 7/7/2020 07/07/2020
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection Approved 7/16/2020 07/16/2020
Monty Johnson ((253) 770-3326)
Plumbing Final Inspection Failed 7/31/2020 07/31/2020
Monty Johnson ((253) 770-3326)
Mechanical Final Inspection Approved 8/10/2020 08/10/2020
Gary Webster ((253) 841-5590)
Fire Final Inspection Not Ready 8/17/2020 08/18/2020
David Drake ((253) 864-4171)
Exit Lighting Test Inspection Not Ready 8/17/2020 08/18/2020
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Approved 8/17/2020 08/18/2020
David Drake ((253) 864-4171)
Plumbing Final Inspection Approved 8/18/2020 08/18/2020
Gary Webster ((253) 841-5590)
Exit Lighting Test Inspection Not Ready 8/18/2020 08/19/2020
David Drake ((253) 864-4171)
Building Final Inspection Failed 8/24/2020 08/24/2020
Gary Webster ((253) 841-5590)
Fire Final Inspection Approved 8/24/2020 08/24/2020
David Drake ((253) 864-4171)
Exit Lighting Test Inspection Approved 8/24/2020 08/24/2020
David Drake ((253) 864-4171)
Planning Final Inspection Failed 8/24/2020 08/24/2020
Chris Beale ((253) 841-5418)
Exit Lighting Test Inspection Approved 8/24/2020 08/24/2020
David Drake ((253) 864-4171)
Final TCO Inspection Approved 08/25/2020
Gary Webster ((253) 841-5590)
Building Final Inspection Comments 08/25/2020
Gary Webster ((253) 841-5590)
Engineering Final Inspection Approved 8/24/2020 08/25/2020
Jason Little ((253) 435-3636)
Comment Building Div Inspection Comments 02/22/2021
Ray Cockerham ((253) 841-5585)
Comment Building Div Inspection VOID 12/10/2021
Legacy user
Building Final Inspection VOID 12/10/2021
build1

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW. FOR ANY QUESTIONS CALL MARCUS SEDLICKAS, ENGINEERING INSPECTOR, AT 253-405-1707 ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03. * All commercial developments, irrigation systems and multi family water service connections shall be protected by at reduced pressure backflow assembly (RPBA), as directed by the City, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District conforming to City Standard Details 03.04.02-1, 03.04.02-2 and 03.04.03. * A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards. * Property owner must install a private pump system per city standards to tie into existing force main. * All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA), per City Standards. This property lies within a regulated Flood Zone. Both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For A0 Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1-foot above grade. (PMC 21.07.060(2)) If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. No fill shall be placed unless specifically shown on the approved site plan. After site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f) Steps shall be taken to prevent drainage onto adjacent lots. No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Flood Elevation Certificate is completed based on "Finished Construction" and reviewed and accepted by the City of Puyallup.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4- EMERGENCY RADIO TEST REQUIRED COMPLY WITH IFC SECTION 510. FIRE FINAL APPROVAL APON COMPLETED TEST RESULTS 5- SEPERATE PERMITS REQUIRED FOR FIRE ALARM AND FIRE SPRINKLER 6- RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 7- FIRE EXTINGUISHERS REQUIRED PER CODE 8- A KNOX BOX IS REQUIRED AT THE FRONT ENTRY ON THE EXTERIOR OF THE BUILDING 9- PIV MUST HAVE A KNOX LOCK OR APPROVED LOCK WITH AN EXTRA KEY PROVIDED IN KNOX BOX 10- EXISTING BUILDINGS WILL NEED TO CONTACT CENTRAL PIERCE FIRE & RESCUE AND UPDATE THE KEY IN THE KNOX BOX 11- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL INSPECTION REQUEST CODES: 2252 EXIT LIGHT TEST 5610 EMERGENCY RADIO TEST 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8PM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.