Permit Application Status

B-20-0085


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-20-0085
Commercial - Tenant Improvement/Remodel
Expired
WAL-MART RE BUSINESS TR 2403
Alteration/Remodel
ADD (3) SELF-CONTAINED CASES AND RESTRIPE (6) PARKING LOT STALLS BLDG/MECH
02/03/2020
04/20/2020
10/17/2020

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 04/09/2020 04/09/2020
Building Review Approved 02/03/2020 03/18/2020
Planning Review In Progress 02/03/2020 02/28/2020
Engineering Review Approved 02/03/2020 02/10/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Mechanical Plan Review Fee $53.50 $53.50 Paid 03/31/2020
No
Planning Building Permit Fee $30.00 $30.00 Paid 03/31/2020
No
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 03/31/2020
No
Building Permit Fee $593.75 $593.75 Paid 03/31/2020
No
Mechanical Permit Fee $82.30 $82.30 Paid 03/31/2020
No
Planning Landscape Review Fee $90.00 $90.00 Paid 03/31/2020
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/31/2020
No
Building Plan Review Fee $385.94 $385.94 Paid 02/03/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection Failed 5/22/2020 05/22/2020
Monty Johnson ((253) 770-3326)
Building Final Inspection Approved 06/02/2020
Monty Johnson ((253) 770-3326)
Plumbing Final Inspection VOID 12/10/2021
Legacy user
Mechanical Rough In Inspection VOID 12/10/2021
Legacy user
Wallboard / Drywall Inspection VOID 12/10/2021
Legacy user
Mechanical Final Inspection VOID 12/10/2021
Legacy user
Comment Building Div Inspection VOID 12/10/2021
Legacy user
Plumbing Rough In Inspection VOID 12/10/2021
Legacy user

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/
Engineering Commercial Standard Conditions Resolved Standard Conditions
Engineering Division
* Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Standard Conditions
Building Division
PERMIT CONDITIONS: Jobsite conditions for inspection will require providing social distance separation; inspectors have discretion to refuse inspections based on Corvid safety measures. COMPLY WITH 2015 IFC AND IBC COMPLY WITH NFPA AND IFC STANDARDS FOR STRIPPING AND FIRE LANES COMPLY WITH CITY MUNICIPAL CODES
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.