Summary

B-20-0406
Residential - New Single Family Dwelling
Permit(s) Issued
VAN AKEN AARON & CARRIE
Other
NEW SFR ~ VAN AKEN
06/08/2020
01/20/2021
08/07/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 10/19/2020
Engineering Review Approved 10/19/2020
Engineering Review Approved 10/01/2020
Building Review Approved 08/25/2020
Building Review Incomplete 08/11/2020 08/12/2020
Engineering Review Incomplete 07/14/2020
Planning Review In Progress 06/17/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Plumbing Plan Review Fee $34.45 $34.45 Paid 01/20/2021
No
WA State Building Code Council Fee (Residential) $6.50 $6.50 Paid 01/20/2021
No
Plumbing Permit Fee $53.00 $53.00 Paid 01/20/2021
No
Planning Review Fee $30.00 $30.00 Paid 01/20/2021
No
Mechanical Permit Fee $203.60 $203.60 Paid 01/20/2021
No
Sanitary Sewer Connection Fee $466.00 $466.00 Paid 01/20/2021
No
Traffic Impact Fee (SFR/ADU) $4,500.00 $4,500.00 Paid 01/20/2021
No
Sewer System Development Charge $5,480.00 $5,480.00 Paid 01/20/2021
No
Water System Development Charge $3,965.00 $3,965.00 Paid 01/20/2021
No
Park Impact Fee $4,017.30 $4,017.30 Paid 01/20/2021
No
Mechanical Plan Review Fee $132.34 $132.34 Paid 01/20/2021
No
Plumbing 1&2 Family Dwellings Fee $462.00 $462.00 Paid 01/20/2021
No
Stormwater Inspection Fee $260.00 $260.00 Paid 01/20/2021
No
Water Connection Fee (Commercial) $2,638.00 $2,638.00 Paid 01/20/2021
No
Building Permit Fee $1,856.15 $1,856.15 Paid 01/20/2021
No
Legacy Fee $3,312.00 $3,312.00 Paid 01/20/2021
No
Legacy Fee $4,500.00 $4,500.00 Paid 01/20/2021
No
Planning Review Fee $1,206.50 $1,206.50 Paid 06/10/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Mechanical Rough In Inspection Pending
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Approved 4/21/2021 04/21/2021
Monty Johnson ((253) 770-3326)
Erosion And Sediment Inspection In Progress 4/21/2021 04/21/2021
Jason Little ((253) 435-3636)
Foundation/Rebar Inspection Approved 4/23/2021 04/23/2021
Monty Johnson ((253) 770-3326)
Underfloor Inspection Failed 5/19/2021 05/19/2021
Monty Johnson ((253) 770-3326)
Underfloor Inspection Approved 5/24/2021 05/24/2021
Gary Webster ((253) 841-5590)
Shear Wall Inspection Comments 6/8/2021 06/08/2021
Monty Johnson ((253) 770-3326)
Shear Wall Inspection Approved 6/23/2021 06/23/2021
Monty Johnson ((253) 770-3326)
Sidesewer Inspection In Progress 06/29/2021
Michael Rosenau ((253) 344-6753)
Storm Inspection In Progress 06/30/2021
Michael Rosenau ((253) 344-6753)
Water Inspection Approved 06/30/2021
Michael Rosenau ((253) 344-6753)
Combination Frame And Rough In Inspection Failed 7/28/2021 07/28/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Approved 8/4/2021 08/04/2021
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection Failed 8/4/2021 08/04/2021
Monty Johnson ((253) 770-3326)
Shower Pan Inspection Approved 9/16/2021 09/16/2021
Monty Johnson ((253) 770-3326)
Frontage/Driveway Inspection In Progress 9/28/2021 09/28/2021
Michael Rosenau ((253) 344-6753)
Carbon Monoxide Detectors Inspection Failed 12/15/2021 12/15/2021 12/15/2021
Monty Johnson ((253) 770-3326)
Carbon Monoxide Detectors Inspection Failed 12/15/2021
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
12/15/2021

Carbon Monoxide Detectors Inspection Not Ready 12/17/2021 12/17/2021 12/17/2021
Monty Johnson ((253) 770-3326)
Elevation Verification Inspection VOID 02/08/2022
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 02/08/2022
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection VOID 02/08/2022
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection VOID 02/08/2022
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Residential Standard Conditions Resolved Engineering Division Standard Conditions
: * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. Refer to approved stormwater site plan dated 12.30.20 for sedimentation, erosion infiltration control methods * attached to permit ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. Refer to approved stormwater site plan dated 12.30.20 for sedimentation, erosion infiltration control methods * attached to permit *The Applicant is responsible to call the Engineering Inspector at 253-435-3650 to schedule a side sewer inspection PRIOR to backfilling. * Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage, per City Standards * Driveway may not exceed a 10% grade at any point or as directed by the City of Puyallup * Sanitary sewer clean-out to be installed at the property line. If located in the driveway area, it must be placed in a frame and covered, per City Standards. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Mechanical and Plumbing OTC Conditions Resolved Building Division Standard Conditions
: REQUIRED INSPECTIONS INSPECTION INSPECTION Code Code 1010 EROSION & CONTROL 2110 FOOTING/SETBACK 9000 PLANNING FINAL BUILDING PERMIT 2115 FOUNDATION/REBAR 6205 SIDESEWER 2120 UNDERFLOOR 6405 STORM 2125 SLAB/INSULATION 6605 WATER 2210 ROOF SHEATHING 6670 FRONTAGE/DRIVEWAY 2215 SHEARWALL 9100 ENGINEERING FINAL BUILDING PERMIT 2230 ENERGY INSPECTION 9900 FINAL RESIDENTIAL 2235 FRAME 2240 COMBINATION FRAME & ROUGH IN 2925 COMMENT This is a general list, other inspections may be requried.

Related Permit & Planning Applications

There are no related items for this permit application.