B-20-0742


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-20-0742
Commercial - New Construction
Closed
NIX PAUL F CREDIT TRUST & NIX
Other
CONSTRUCTION OF STORMWATER DETENTION VAULT ~ PUYALLUP CORPORATE CENTER**2450 E. MAIN/SCHOONER FARMER SITE* BUILD ONLY BLDG/MECH *8.30 chnge of contractor*
09/22/2020
11/25/2020
09/17/2022
03/21/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 11/23/2020
Planning Review In Progress 10/19/2020
Building Review Approved 10/05/2020

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 11/25/2020
No
Planning Building Permit Fee $120.00 $120.00 Paid 11/25/2020
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 11/25/2020
No
Planning Landscape Review Fee $300.00 $300.00 Paid 11/25/2020
No
Building Plan Review Fee $4,808.21 $4,808.21 Paid 11/25/2020
No
Building Permit Fee $7,397.25 $7,397.25 Paid 11/25/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation/Rebar Inspection Failed 12/11/2020 12/11/2020
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection Failed 12/14/2020 12/14/2020
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 12/29/2020 12/29/2020
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 1/6/2021 01/06/2021
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 1/19/2021 01/19/2021
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 1/28/2021 01/28/2021
Gary Webster ((253) 841-5590)
Footing/Setback Inspection In Progress 2/26/2021 02/26/2021
Gary Webster ((253) 841-5590)
Building Final Inspection Failed 5/5/2021 05/05/2021
Gary Webster ((253) 841-5590)
Planning Final Inspection VOID 12/10/2021
Legacy user
Fire Final Inspection VOID 12/10/2021
Legacy user

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: THE RELEASE OF BUILDING PERMIT B-20-0742 IS GRANTED WITH THE MUTUAL UNDERSTANDING THAT ANY DELAY RESULTING FROM CHANGING THE VAULT SIZE, ALIGNMENT, SEPARATION FROM UTILITIES, ETC. WILL BE THE RESPONSIBILITY OF THE DEVELOPER AND BARGHAUSEN CONSULTING ENGINEERS. SEE ATTACHED EMAIL OF ACKNOWLEDGEMENT DATED 11/18/2020 LL 11/19/202 * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** FINAL APPROVAL WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-20-0137 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. SEE CIVIL PERMIT E-20-0302 * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
04/11/2022 Report Inspection Report (Building Final Inspection)