CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-20-0934


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-20-0934
Pre-Fabricated Building
Closed
PUYALLUP SCHOOL DIST NO 3
New
INSTALLATION OF PORTABLE - RELOCATED FROM ANOTHER SCHOOL PROPERTY/ADULT ED/TRAINING ~ GLAD PORTABLE/ PSD BLDG ONLY
11/24/2020
03/24/2021
01/24/2022
09/10/2021

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 12/09/2021
Engineering Review VOID 12/09/2021
Engineering Review Approved 03/23/2021
Engineering Traffic Review Approved 02/23/2021
Building Review Approved 02/02/2021
Planning Review In Progress 12/14/2020
Fire Review Approved 12/03/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Impact Fee $4,950.00 $4,950.00 Paid 03/18/2021
No
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 01/15/2021
No
Planning Building Permit Fee $30.00 $30.00 Paid 01/15/2021
No
Planning Landscape Review Fee $90.00 $90.00 Paid 01/15/2021
No
Building Plan Review Fee $154.21 $154.21 Paid 01/15/2021
No
Building Permit Fee $237.25 $237.25 Paid 01/15/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 01/15/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Approved 3/31/2021 03/31/2021
Gary Webster ((253) 841-5590)
Fire Final Inspection Approved 5/26/2021 05/27/2021
David Drake ((253) 864-4171)
Engineering Final Inspection Approved 09/09/2021
Michael Rosenau ((253) 841-5411)
Building Final Inspection Approved 9/10/2021 09/10/2021
Gary Webster ((253) 841-5590)
Engineering Final Inspection VOID 5/26/2021 12/09/2021
Michael Rosenau ((253) 841-5411)
Planning Final Inspection VOID 6/23/2021 12/09/2021
Nabila Comstock ((253) 770-3361)
Engineering Final Inspection VOID 6/23/2021 12/09/2021
Michael Rosenau ((253) 841-5411)
Comment Building Div Inspection VOID 7/28/2021 12/09/2021
Monty Johnson ((253) 770-3326)
Engineering Final Inspection VOID 9/8/2021 12/09/2021
Michael Rosenau ((253) 841-5411)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-20-0549 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. FOLLOW APPROVED CIVIL PLAN E-20-0549 ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. FOLLOW APPROVED CIVIL PLAN E-20-0549 * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- A MINIMUM OF ONE 2A-10BC FIRE EXTINGUISHER IS REQUIRED IN EACH ROOM 2- A FIRE ALARM SYSTEM IS REQUIRED 3- A SEPERATE PERMIT IS REQUIRED FOR FIRE ALARM INSPECTION REQUEST CODES: 9200 FIRE FINAL BUILDING PERMIT INSPECTION REQUIRED SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8PM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.