B-20-0982


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-20-0982
Commercial - New Construction
Finaled
CPSRTA
Other
DP - 05 - BLDG GARAGE & ABUTMENT ~ SOUND TRANSIT BLDG/MECH/PLUMB
12/15/2020
03/18/2021
09/19/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 03/15/2021
Building Review Approved 03/14/2021
Engineering Traffic Review Approved 02/08/2021
Planning Review In Progress 02/04/2021
Engineering Review Incomplete 01/07/2021
Fire Review Approved 01/04/2021

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 03/18/2021
No
Planning Building Permit Fee $120.00 $120.00 Paid 03/18/2021
No
Sanitary Sewer Connection Fee $356.00 $356.00 Paid 03/18/2021
No
Mechanical Plan Review Fee $255.35 $255.35 Paid 03/18/2021
No
Building Plan Review Fee $51,536.97 $51,536.97 Paid 03/18/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/18/2021
No
Planning Landscape Review Fee $300.00 $300.00 Paid 03/18/2021
No
Mechanical Permit Fee $392.85 $392.85 Paid 03/18/2021
No
Plumbing Permit Fee $794.00 $794.00 Paid 03/18/2021
No
Plumbing Plan Review Fee $516.10 $516.10 Paid 03/18/2021
No
Water System Development Charge $4,020.00 $4,020.00 Paid 03/18/2021
No
Building Permit Fee $79,287.65 $79,287.65 Paid 03/18/2021
No
Sewer System Development Charge $25,303.56 $25,303.56 Paid 03/18/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation/Rebar Inspection In Progress 4/9/2021 04/09/2021
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 4/15/2021 04/15/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 4/27/2021 04/27/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection In Progress 4/27/2021 04/27/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Comments 5/4/2021 05/04/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection In Progress 5/5/2021 05/05/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection Comments 5/13/2021 05/13/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Comments 5/13/2021 05/13/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection In Progress 5/26/2021 05/26/2021
Gary Webster ((253) 841-5590)
Footing/Setback Inspection Comments 6/4/2021 06/04/2021
Monty Johnson ((253) 770-3326)
Shear Wall Inspection Comments 6/4/2021 06/04/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Comments 6/11/2021 06/11/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Comments 6/17/2021 06/17/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Comments 7/9/2021 07/09/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection In Progress 7/12/2021 07/12/2021
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection Comments 7/19/2021 07/19/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Comments 7/29/2021 07/29/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection In Progress 7/30/2021 07/30/2021
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection Failed 7/30/2021 07/30/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection In Progress 8/10/2021 08/10/2021
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection Failed 8/12/2021 08/12/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Comments 8/12/2021 08/12/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Comments 8/12/2021 08/12/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Comments 8/24/2021 08/24/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Comments 8/25/2021 08/25/2021
Monty Johnson ((253) 770-3326)
Frame Inspection Comments 8/26/2021 08/26/2021
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Comments 8/27/2021 08/27/2021
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection In Progress 8/30/2021 08/30/2021
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 9/9/2021 09/09/2021
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 9/13/2021 09/13/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 9/15/2021 09/15/2021
Monty Johnson ((253) 770-3326)
Frame Inspection In Progress 9/15/2021 09/15/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/15/2021 09/15/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 9/16/2021 09/16/2021
Monty Johnson ((253) 770-3326)
Frame Inspection Not Ready 9/21/2021 09/21/2021
Gary Webster ((253) 841-5590)
Mechanical Rough In Inspection In Progress 9/21/2021 09/21/2021
Gary Webster ((253) 841-5590)
Wallboard / Drywall Inspection In Progress 9/21/2021 09/21/2021
Gary Webster ((253) 841-5590)
Combination Frame And Rough In Inspection Not Ready 9/21/2021 09/21/2021
Gary Webster ((253) 841-5590)
Frame Inspection In Progress 9/22/2021 09/22/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection In Progress 9/22/2021 09/22/2021
Gary Webster ((253) 841-5590)
Frame Inspection Failed 9/27/2021 09/27/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 9/27/2021 09/27/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 9/27/2021 09/27/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/27/2021 09/27/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 9/28/2021 09/28/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 9/28/2021 09/28/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 9/29/2021 09/29/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/29/2021 09/29/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 9/29/2021 09/29/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 9/30/2021 09/30/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 9/30/2021 09/30/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 10/1/2021 10/01/2021
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection In Progress 10/5/2021 10/05/2021
Gary Webster ((253) 841-5590)
Energy (Insulation) Inspection In Progress 10/6/2021 10/06/2021
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection In Progress 10/6/2021 10/06/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 10/8/2021 10/08/2021
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection In Progress 10/11/2021 10/11/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Comments 10/14/2021 10/13/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 10/18/2021 10/18/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection In Progress 10/20/2021 10/20/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection In Progress 10/21/2021 10/21/2021
Gary Webster ((253) 841-5590)
Wallboard / Drywall Inspection In Progress 10/25/2021 10/25/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 10/27/2021 10/27/2021
Gary Webster ((253) 841-5590)
Wallboard / Drywall Inspection In Progress 10/28/2021 10/28/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection In Progress 11/9/2021 11/09/2021
Gary Webster ((253) 841-5590)
Mechanical Rough In Inspection In Progress 11/12/2021 11/12/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Failed 11/17/2021 11/17/2021
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection In Progress 11/18/2021 11/18/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 11/18/2021 11/18/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 11/19/2021 11/19/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 11/22/2021 11/22/2021
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection In Progress 11/22/2021 11/22/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 11/24/2021 11/24/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 12/1/2021 12/01/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection In Progress 12/2/2021 12/02/2021
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Failed 12/21/2021 12/22/2021 12/22/2021
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
12/22/2021
1 ; complete insulation at ceiling in rooms - 102 ( 2'' ceiling insulation) 105 (10'' ceiling insulation) 106 (11'' ceiling insulation)

Combination Frame And Rough In Inspection Partial Pass 1/7/2022 1/7/2022 01/07/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
01/07/2022
ELEVATOR FRONTS FRAMING OK.

Wallboard / Drywall Inspection Partial Pass 1/12/2022 1/12/2022 01/12/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
01/12/2022
1:INSIDE OF ELEVATOR FACE OK ALL LEVELS AT PARKING GARAGE

Wallboard / Drywall Inspection Partial Pass 1/20/2022 1/20/2022 01/20/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
01/20/2022
1:inside of elevator 1st and 2nd level at abutment ok

Wallboard / Drywall Inspection Partial Pass 1/21/2022 1/21/2022 01/21/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
01/21/2022
densglass @ elev fronts - ok

Wallboard / Drywall Inspection Partial Pass 1/26/2022 1/26/2022 01/26/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
01/26/2022
densglass @ elev fronts - ok

Other/Miscellaneous
Carried Forward
01/26/2022
1:rock on faces of abutment elevator ok, both levels

Comment Building Div Inspection Not Ready 4/12/2022 4/12/2022 04/12/2022
Monty Johnson ((253) 770-3326)
Fire Final Inspection Failed 4/26/2022 04/27/2022
David Drake ((253) 864-4171)
Other/Miscellaneous
Carried Forward
04/27/2022
1. Provide Vehicle Impact protection for generator. 2. Fire extinguishers are to be clearly marked and visible to all. 3. Emergency Light test approved.

Building Final Inspection Failed 4/28/2022 4/28/2022 04/28/2022
Monty Johnson ((253) 770-3326)
Mechanical Final Inspection Failed 4/28/2022 4/28/2022 04/28/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
04/28/2022
INSP FOR BUILDING FINAL 1:complete curb paint at raised curb by generator 2;steps up to east security room to have equal rise and not exceed 7" 3:complete all door hardware. 4:provide max 4" openings at cable type guardrails. 5:complete all final letters as discussed. 6:provide EOR as built approval for generator pad. 7:provide data showing max setting on semi heated areas thermostats.

Plumbing Final Inspection Failed 4/28/2022 4/28/2022 04/28/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
04/28/2022
will need to verify drain down for hose bibs in lieu of other types of freeze protection.

Fire Final Inspection Partial Pass 5/2/2022 5/2/2022 05/02/2022
David Drake ((253) 864-4171)
Other/Miscellaneous
Resolved
05/02/2022
1. Provide Vehicle Impact protection for generator. 2. Fire extinguishers are to be clearly marked and visible to all. 3. Emergency Light test approved.

Fire Final
Carried Forward
05/04/2022
TCO, Fire Alarm Passed, Fire Sprinkler Passed, Emergency EXIT Passed, Building Passed

Building Final Inspection Partial Pass 5/4/2022 5/4/2022 05/04/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
05/04/2022
Building dept requirements have been fulfilled, ok for TCO, Received approval from Ken Cook with engineering dept for tco and planning will provide final after all there requirements have been completed. all ppe for any visitors or workers on site will be regulated by permit holder until full C of O.

Wallboard / Drywall Inspection Partial Pass 03/23/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
03/23/2023
densglass @ elev fronts - ok

Wallboard / Drywall Inspection Partial Pass 03/23/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
03/23/2023
densglass @ elev fronts - ok

Wallboard / Drywall Inspection Partial Pass 03/23/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Resolved
03/23/2023
densglass @ elev fronts - ok

Wallboard / Drywall Inspection Partial Pass 03/23/2023
Ray Cockerham ((253) 841-5585)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-20-0504 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. SEE APPROVED CIVIL PLANS E-20-0504 ** ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: SEPERATE PERMITS REQUIRED FOR FIRE ALARM AND FIRE SPRINKLER SYSTEMS.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.