Permit Application Status
B-21-0311
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 04/04/2022 |
Air Handling Unit (Up to 10,000 cfm) Fee | $14.10 | $14.10 | Paid | 04/04/2022 |
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee | $19.40 | $19.40 | Paid | 04/04/2022 |
Building Permit Fee | $993.75 | $993.75 | Paid | 04/04/2022 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 04/04/2022 |
Building Plan Review Fee | $645.94 | $645.94 | Paid | 04/04/2022 |
Mechanical Plan Review Fee | $47.78 | $47.78 | Paid | 04/04/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 04/04/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $2,050.97 | $2,050.97 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Engineering Div Inspection | Pending | |||
Underfloor Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Below Slab Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Ceiling Grid/T-Bar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Wallboard / Drywall Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Re-Roof Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Gas Test Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Refrigeration Line Test Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Cover Inspection/Thrust Blocks Inspection | Pending | |||
Floodproof Certification Inspection | Pending | |||
Elevation Verification Inspection | Pending | |||
Footing/Setback Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
02/28/2023
1. excludes patio footing
2.ok to pour pending special inspection report of bar tie ins at footing as discussed with contractor
3. if poured during freezing weather contractor to protect concrete
|
||||
Comment Building Div Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
03/02/2023
1.talked about progression of job
|
||||
Foundation/Rebar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Slab/Insulation Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Block Wall Rebar Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
05/04/2023
1. talked about inspection process and special inspections required
|
||||
Roof Sheathing Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
05/10/2023
1. stud attachment to steel plate approved per special inspection
|
||||
Energy (Insulation) Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Building Final Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Outstanding
06/03/2024
1.provide fire final approval
2. provide address
3. complete handrails at stairs per code
4. provide landing at bottom of stairs per code
|
||||
Foundation/Rebar Inspection | Not Ready | 2/28/2023 | 2/28/2023 | 02/28/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
02/28/2023
1. complete forms prior to next inspection
2.complete rebar tie in to existing foundation and provide special inspection reports to support
3. not ready
|
||||
Footing/Setback Inspection | Partial Pass | 2/28/2023 | 2/28/2023 | 02/28/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
02/28/2023
1. excludes patio footing
2.ok to pour pending special inspection report of bar tie ins at footing as discussed with contractor
3. if poured during freezing weather contractor to protect concrete
|
||||
Comment Building Div Inspection | Not Ready | 3/2/2023 | 3/2/2023 | 03/02/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
03/02/2023
1.talked about progression of job
|
||||
Foundation/Rebar Inspection | Partial Pass | 3/6/2023 | 3/6/2023 | 03/06/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
03/06/2023
1. complete forms prior to next inspection
2.complete rebar tie in to existing foundation and provide special inspection reports to support
3. not ready
|
||||
Slab/Insulation Inspection | Partial Pass | 4/4/2023 | 4/4/2023 | 04/04/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
04/04/2023
1. provide min clearance around rebar at insulation as per city approved plans
|
||||
Slab/Insulation Inspection | Partial Pass | 4/12/2023 | 4/12/2023 | 04/12/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
04/12/2023
1. provide min clearance around rebar at insulation as per city approved plans
|
||||
Block Wall Rebar Inspection | Not Ready | 4/25/2023 | 4/25/2023 | 04/25/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
04/25/2023
1. talked about inspection process and special inspections required
|
||||
Block Wall Rebar Inspection | Partial Pass | 5/2/2023 | 5/2/2023 | 05/02/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/02/2023
1. talked about inspection process and special inspections required
|
||||
Block Wall Rebar Inspection | Partial Pass | 5/4/2023 | 5/4/2023 | 05/04/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/04/2023
1. talked about inspection process and special inspections required
|
||||
Roof Sheathing Inspection | Partial Pass | 5/10/2023 | 5/10/2023 | 05/10/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/10/2023
1. stud attachment to steel plate approved per special inspection
|
||||
Energy (Insulation) Inspection | Partial Pass | 5/31/2023 | 5/31/2023 | 05/31/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Fire Final Inspection | Not Ready | 4/18/2024 | 4/18/2024 | 04/18/2024 |
David Drake ((253) 864-4171) | ||||
Fire Final
Outstanding
04/18/2024
No access, No address
|
||||
Exit Lighting Test Inspection | VOID | 04/18/2024 | ||
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | VOID | 04/18/2024 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 04/18/2024 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 04/18/2024 | ||
David Drake ((253) 864-4171) | ||||
Plumbing Final Inspection | Failed | 4/18/2024 | 4/18/2024 | 04/18/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
04/18/2024
1 ; nobody on-site at time of inspection. (12:50 pm)
|
||||
Mechanical Final Inspection | Failed | 4/18/2024 | 4/18/2024 | 04/18/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
04/18/2024
1 ; nobody on-site at time of inspection. (12:50 pm)
|
||||
Building Final Inspection | Failed | 4/18/2024 | 4/18/2024 | 04/18/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
04/18/2024
1 ; nobody on-site at time of inspection. (12:50 pm)
|
||||
Plumbing Final Inspection | Not Ready | 5/9/2024 | 5/9/2024 | 05/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/09/2024
1 ; nobody on-site at time of inspection. (12:50 pm)
|
||||
Other/Miscellaneous
Carried Forward
05/09/2024
provide city approved plans on site at time of next inspection as discussed with contractor
|
||||
Mechanical Final Inspection | Not Ready | 5/9/2024 | 5/9/2024 | 05/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/09/2024
1 ; nobody on-site at time of inspection. (12:50 pm)
|
||||
Other/Miscellaneous
Carried Forward
05/09/2024
1. provide city approved plans on site at time of inspection
|
||||
Building Final Inspection | Not Ready | 5/9/2024 | 5/9/2024 | 05/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
05/09/2024
1 ; nobody on-site at time of inspection. (12:50 pm)
|
||||
Other/Miscellaneous
Carried Forward
05/09/2024
1. provide city approved plans on site at time of next inspection
|
||||
Building Final Inspection | Failed | 6/3/2024 | 6/3/2024 | 06/03/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Resolved
06/03/2024
1 ; nobody on-site at time of inspection. (12:50 pm)
|
||||
Other/Miscellaneous
Resolved
06/03/2024
1. provide city approved plans on site at time of next inspection
|
||||
Other/Miscellaneous
Carried Forward
06/03/2024
1.provide fire final approval
2. provide address
3. complete handrails at stairs per code
4. provide landing at bottom of stairs per code
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
General Permit Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.
* Work shall not proceed until the inspector has approved the stages of construction.
* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.
* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance.
* By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington.
* TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
* Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456
* THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING.
** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW.
** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. SEE ATTACHED STANDARD DETAILS THAT CAN BE USED
* Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
* The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
* No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
* Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
* All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03.
|
|||||
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
PERMIT CONDITIONS:
|
|||||
Pipeline Notfication Rcw 19.122.033 | Open | Engineering Division | Standard Conditions | ||
:
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
|||||
Miscellaneous Condition | Resolved | Development & Permitting Services | Prior to Issuance | 05/27/2022 | |
:
PERMIT READY TO ISSUE ONCE CONTRACTOR INFO (L&I AND COP BUS LIC) IS REC'D AND VERIFIED, SENT EMAIL TO DREW YOUNG THIS DATE ~ JJ
|