Summary

B-21-0349
Pre-Fabricated Building
Closed
PUYALLUP SCHOOL DIST NO 3
New
PREPARE SITE & FOUNDATION FOR A MODUALR BLDG CIVIL PERMIT E-19-0574 BLDG/MECH/PLUMB
05/14/2021
06/08/2021
11/06/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review In Progress 06/07/2021
Engineering Review Approved 06/04/2021
Engineering Traffic Review Approved 05/28/2021
Building Review Approved 05/27/2021
Building Review Approved 05/27/2021
Fire Review Approved 05/20/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Sewer System Development Charge $6,332.84 $6,332.84 Paid 06/08/2021
No
Sanitary Sewer Connection Fee $356.00 $356.00 Paid 06/08/2021
No
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 05/25/2021
No
Plumbing Plan Review Fee $93.60 $93.60 Paid 05/25/2021
No
Mechanical Permit Fee $189.95 $189.95 Paid 05/25/2021
No
Plumbing Permit Fee $144.00 $144.00 Paid 05/25/2021
No
Mechanical Plan Review Fee $123.47 $123.47 Paid 05/25/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 05/25/2021
No
Building Plan Review Fee $523.09 $523.09 Paid 05/25/2021
No
Building Permit Fee $804.75 $804.75 Paid 05/25/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation/Rebar Inspection Not Ready 6/11/2021 06/11/2021
Shannon King ((253) 840-6684)
Footing/Setback Inspection Not Ready 6/11/2021 06/11/2021
Shannon King ((253) 840-6684)
Footing/Setback Inspection In Progress 6/14/2021 06/14/2021
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection In Progress 6/14/2021 06/14/2021
Shannon King ((253) 840-6684)
Frame Inspection Failed 7/13/2021 07/13/2021
Shannon King ((253) 840-6684)
Comment Building Div Inspection Comments 7/14/2021 07/14/2021
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection In Progress 10/27/2021 10/27/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Failed 10/27/2021 10/27/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Approved 10/29/2021 10/29/2021
Shannon King ((253) 840-6684)
Comment Building Div Inspection Comments 11/24/2021
Monty Johnson ((253) 770-3326)
Building Final Inspection In Progress 12/02/2021
Monty Johnson ((253) 770-3326)
Carbon Monoxide Detectors Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Frame Inspection VOID 7/16/2021 05/10/2023
Shannon King ((253) 840-6684)
Frame Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Mechanical Final Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)
Plumbing Final Inspection VOID 05/10/2023
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-19-0574 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * Coordinate with City Inspector, Michael Rosenau, prior to starting work by calling him at 253-344-6753.* * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. The use of a dispersion trench has been approved. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. SEE CIVIL PERMIT E-19-0574 FOR APPROVED METHODS. * Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
05/10/2023 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.