CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-21-0359


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0359
Commercial - Tenant Improvement/Remodel
Closed
DCT PUYALLUP INDUSTRIAL PARK LLC
Alteration/Remodel
TI - DEMO PORTION OF EXISTING OFFICE SPACES, CONVERT NEW WAREHOUSE SPACE;MECH TO REMAIN THE SAME ~ PROLOGIS, STE A101 & A103 BLDG/PLUMB
05/18/2021
01/13/2022
11/05/2022
05/09/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 11/29/2021
Engineering Review Approved 11/17/2021
Engineering Traffic Review Approved 07/19/2021
Building Review Incomplete 06/21/2021
Planning Review In Progress 06/21/2021
Fire Review Approved 06/07/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 01/13/2022
Building Permit Fee $643.75 $643.75 Paid 01/13/2022
Building Plan Review Fee $418.44 $418.44 Paid 01/13/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 01/13/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Fire Final Inspection Not Ready 2/2/2022 2/2/2022 02/02/2022
David Drake ((253) 864-4171)
Corrections:


Fire Final
Outstanding
02/11/2022
No one onsite. Fire Building Final not approved. Contact ddrake@puyallupwa.gov F-21-0057 Original Fire Sprinkler permit was canceled by Fire Systems West after direction was given to remove and cap added drops. There were two Fire Sprinkler permits for this site. A new Fire Sprinkler Permit for the demo of the drops is now required. F-21-0057 The below email was sent to Theron Davis at Fire Systems West. After this email was sent, they canceled the permit without completing the work. I’ve talked with the building official and these are his recommendations. We have two options. 1. The permit stays open until we have a new permit for the work that will be updated or changed. This includes a building permit for the walls and grid. A new fire sprinkler permit showing any changes to what you already installed and if there are any new changes . 2. Remove and cap which will final out your permit. We can’t give a final for something that is not code compliant in all aspects. It creates issues for all parties involved now.

Fire Final Inspection Failed 2/9/2022 2/9/2022 02/08/2022
David Drake ((253) 864-4171)
Fire Final Inspection Passed 2/22/2022 2/22/2022 02/22/2022
David Drake ((253) 864-4171)
Building Final Inspection Failed 2/28/2022 2/28/2022 02/28/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/28/2022
1:provide electrical final 2:provide engineers roof framing details or an as built approval for band aid patches in several places and at least three rtu removal infills.

Building Final Inspection Passed 5/9/2022 5/9/2022 05/09/2022
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Comment Engineering Div Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Shear Wall Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Exit Lighting Test Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Hydronic Piping Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Exhaust Hood Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Medical Gas Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Fire Or Smoke Damper Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Cover Inspection/Thrust Blocks Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Hydrostatic Test 200Lbs 2Hrs VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Emergency Radio Test Review Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)
Engineering Final Inspection VOID 05/09/2022
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Development & Permitting Services
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Standard Conditions
Development & Permitting Services
* Prior to STARTING site work; request inspection for Erosion and Sediment ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-XX-XXXX IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03. * All commercial developments, irrigation systems and multi family water service connections shall be protected by at reduced pressure backflow assembly (RPBA), as directed by the City, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District conforming to City Standard Details 03.04.02-1, 03.04.02-2 and 03.04.03. * A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards. * Property owner must install a private pump system per city standards to tie into existing force main. * All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA), per City Standards. This property lies within a regulated Flood Zone. Both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For A0 Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1 foot above grade. (PMC 21.07.060(2)) If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. No fill shall be placed unless specifically shown on the approved site plan. After site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f) Steps shall be taken to prevent drainage onto adjacent lots. No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Flood Elevation Certificate is completed based on "Finished Construction" and reviewed and accepted by the City of Puyallup. PERMIT CONDITIONS: 1 COMPLY WITH 2018 IFC AND 2018 IBC 2 TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3 EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4 A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED 5 RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 6 FIRE EXTINGUISHERS REQUIRED PER CODE 7 ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right of way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on site prior to excavation.
Pipeline Notfication Rcw 19.122.033 Open Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/06/2022 Form B-21-0359 APPLICATION (Flattened)
01/06/2022 Plans B-21-0359 PLANS Prologis Puyallup 2_Suites A101-A103 TI_Revision 1 Set (Flattened) (Stamped)
01/06/2022 Plans b-21-0359 sampling connection detail (Flattened) (Stamped)
01/13/2022 Receipt Receipt for transaction:2022-000057
01/20/2022 Permit Permit - Detailed
01/20/2022 Letter Permit Job Card
05/09/2022 Report Inspection Report (Building Final Inspection)