CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-21-0651


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0651
Demolition
Permit(s) Issued
WASHINGTON COLD STORAGE INC
Demolition
DEMO REMAINDER OF BUILDING DAMAGED BY FIRE**PLEASE SEE PERMIT CONDITIONS**
08/24/2021
08/24/2021
04/20/2022

Locations

Reviews

There are no reviews for this permit application, or you are not authorized to view them.

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $390.00 $390.00 Paid 08/24/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection Pending
Comment Building Div Inspection Pending
Engineering Final Inspection Pending
Comment Building Div Inspection Comments 10/15/2021
Michael Rosenau ((253) 841-5411)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov Conditions 1) Contractor is responsible for Puget sound quality control notification in any permits approvals for authorization. 2)Institute and maintain preventative measures for rodent and pest control. 3) Restrict and limit access to the construction site. 4) All materials and hazardous materials are to be dumped in accordance with Washington state and federal laws. 5) In accordance with local and state nuisance laws and regulations efforts to remove food subject to spoilage she'll be pursued as directed by fire department and other federal authorities. 6) Fee payment is being deferred in order to facilitate the emergency demolition of the building for public safety, per the DPS Director. Ray Cockerham Please call 2533770929 for questions. Sent Remotely 253-841-5585
Demolition Standard Conditions Resolved Engineering Division Standard Conditions
: * PRIOR TO STARTING SITE WORK REQUEST AN INSPCETION FOR EROSION AND SEDIMENT CONTROL. INSPECTION REQUEST PHONE NUMBER IS 1-877-232-6456 AND THE INSPECTION CODE IS # 1010. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICED TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPSTREAM OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * I agree to call the Utility Notification Center at 1-800-424-5555 (811) before beginning any excavation. Call before you dig, it's the law. * I agree to cut and cap the sanitary side sewer at the property line while under the supervision of a City Inspector. The existing side sewer shall not be reused. The applicant is responsible to call the inspection line at 1-877-232-6456, code #2925 to schedule inspections. Utility inspections are required PRIOR to backfilling. * The applicant is responsible to decommission the existing septic system per Tacoma Pierce County Health Department (TPCHD) requirements. A decommissioning certificate is required to be filed with TPCHD and a copy submitted to the City of Puyallup. * The applicant is responsible to cut and cap the water service at the property line while under the supervision of a City Inspector. Schedule an inspection by calling 1-877-232-6456, code #2925. The City Water Division shall perform the water meter removal. Contact Jeff Daschofsky at 253-841-5512 to schedule the water meter or service removal. * The applicant is responsible to decommission the existing private well per Tacoma Pierce County Health Department (TPCHD) requirements. A decommissioning certificate is required to be filed with TPCHD and a copy submitted to the City of Puyallup. * If the existing private well is to be retained it will be necessary to install a RPBA on the domestic water service connection to the City's system. * I agree to call the inspection line at 253-445-4795 or 253-445-5092 to schedule a building final inspection. Enter action code 9800 when prompted for Building Inspection Final. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.