CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-21-0654


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0654
Commercial - New Construction
Expired
VIKING JV LLC
Other
GENERATOR SCREENING~ LIFE SCIENCE
08/24/2021
01/16/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review VOID 07/20/2022
Planning Review In Progress 09/14/2021
Building Review Incomplete 09/14/2021
Engineering Traffic Review Approved 08/27/2021
Engineering Review Approved 08/27/2021
Fire Review Approved 08/25/2021

Fees

There are no fees for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection VOID 07/20/2022
CityView System Manger
Building Final Inspection VOID 07/20/2022
CityView System Manger
Foundation/Rebar Inspection VOID 07/20/2022
CityView System Manger
Fire Final Inspection VOID 07/20/2022
CityView System Manger
Combination Frame And Rough In Inspection VOID 07/20/2022
CityView System Manger
Carbon Monoxide Detectors Inspection VOID 07/20/2022
CityView System Manger
Shear Wall Inspection VOID 07/20/2022
CityView System Manger
Engineering Final Inspection VOID 07/20/2022
CityView System Manger
Footing/Setback Inspection VOID 07/20/2022
CityView System Manger
Ceiling Grid/T-Bar Inspection VOID 07/20/2022
CityView System Manger
Mechanical Rough In Inspection VOID 07/20/2022
CityView System Manger
Energy (Insulation) Inspection VOID 07/20/2022
CityView System Manger
Frame Inspection VOID 07/20/2022
CityView System Manger
Mechanical Final Inspection VOID 07/20/2022
CityView System Manger
Wallboard / Drywall Inspection VOID 07/20/2022
CityView System Manger
Plumbing Rough In Inspection VOID 07/20/2022
CityView System Manger
Plumbing Final Inspection VOID 07/20/2022
CityView System Manger

Conditions

Condition Status Category
General Permit Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
** Please review sheets C4 of 11 and C5 of 11 for water service line, FDC line and storm line, attached. All lines must be located prior to installing screening ** * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Open Standard Conditions
Building Division
PERMIT CONDITIONS: Maintain proper clearances per IBC, IFC, NFPA
Pipeline Notfication Rcw 19.122.033 Open Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.