B-21-0670
Pre-Fabricated Building
Expired
SCM ASSOCIATES LLC
New
PORTABLE RELOCATIOIN ~ PRO-VACBLDG/MECH/PLUMb CIVILS:E-21-0071
08/31/2021
10/26/2021
12/27/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Traffic Review Approved 10/26/2021
Engineering Review Incomplete 10/21/2021
Engineering Review Approved 10/21/2021
Building Review Approved 10/20/2021
Building Review Incomplete 10/19/2021
Planning Review In Progress 10/18/2021
Fire Review Approved 09/13/2021
Building Review Incomplete 09/09/2021

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 10/26/2021
No
Planning Building Permit Fee $30.00 $30.00 Paid 10/26/2021
No
Planning Landscape Review Fee $90.00 $90.00 Paid 10/26/2021
No
Building Permit Fee $209.25 $209.25 Paid 10/26/2021
No
Building Plan Review Fee $136.01 $136.01 Paid 10/26/2021
No
Water System Development Charge $942.69 $942.69 Paid 10/26/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 10/26/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Energy (Insulation) Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Fire Final Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Carbon Monoxide Detectors Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Ceiling Grid/T-Bar Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Footing/Setback Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Combination Frame And Rough In Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Planning Final Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Plumbing Final Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Plumbing Rough In Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Mechanical Rough In Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Foundation/Rebar Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Frame Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Wallboard / Drywall Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Shear Wall Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Building Final Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Engineering Final Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)
Mechanical Final Inspection VOID 06/30/2022
Joyce Kennedy ((253) 841-5405)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: ** Upon inspection of the water connection/system, if proper backflow protection (RPBA) is not in place one will be installed prior to granting occupancy. The installation of a RPBA does require approved plans and record drawings. ** All guidance of the TPCHD approval of the portable septic system must be followed, attached. ** * *Please see the Fact Sheet (attached) for construction stormwater pollution prevention for projects that disturb less than 2,000 SF. These guild lines must be followed. ** * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS:
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.