CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-21-0802


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0802
Demolition
Expired
RJ 1526 LLC
Demolition
DEMO 574SF HOUSE, DECK & CARPORT
10/05/2021
10/21/2021
02/19/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 10/20/2021
Planning Review In Progress 10/11/2021
Building Review Approved 10/08/2021
Fire Review Approved 10/06/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Legacy Fee $982.00 $982.00 Paid 10/21/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection VOID 08/23/2022
Joyce Kennedy ((253) 841-5405)
Erosion And Sediment Inspection VOID 08/23/2022
Joyce Kennedy ((253) 841-5405)
Engineering Final Inspection VOID 08/23/2022
Joyce Kennedy ((253) 841-5405)
Comment Building Div Inspection VOID 08/23/2022
Joyce Kennedy ((253) 841-5405)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Demolition Standard Conditions Resolved Engineering Division Standard Conditions
: *THE EXISTING WATER SERVICE SUPPLIES 1402, 1404, 1406, & 1408 15TH ST NW. WATER SERVICE REMOVAL AND SEPTIC DECOMMISSIONING SHALL BE ASSOCIATED WITH THIS DEMOLITION PERMIT ON BEHALF OF ALL FOUR HOUSES. * PRIOR TO STARTING SITE WORK REQUEST AN INSPCETION FOR EROSION AND SEDIMENT CONTROL. INSPECTION REQUEST PHONE NUMBER IS 1-877-232-6456 AND THE INSPECTION CODE IS # 1010. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICED TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPSTREAM OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * I agree to call the Utility Notification Center at 1-800-424-5555 (811) before beginning any excavation. Call before you dig, it's the law. * The applicant is responsible to decommission the existing septic system per Tacoma Pierce County Health Department (TPCHD) requirements. A decommissioning certificate is required to be filed with TPCHD and a copy submitted to the City of Puyallup. * The applicant is responsible to cut and cap the water service at the property line while under the supervision of a City Inspector. Schedule an inspection by calling 1-877-232-6456, code #2925. The City Water Division shall perform the water meter removal. Contact Jeff Daschofsky at 253-841-5512 to schedule the water meter or service removal. * I agree to call the inspection line at 253-445-4795 or 253-445-5092 to schedule a building final inspection. Enter action code 9800 when prompted for Building Inspection Final. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.