Summary

E-10-0010
Utility Service Repair/PRIVATE PROPERTY ONLY
Closed
CAFARO NORTHWEST PARTNERSHIP
Repair
SIDE SEWER REPAIR - DICK'S SPORTING GOODS
01/15/2010
01/15/2010
03/16/2010
04/29/2010

Locations

Property
6021010051

Property
6021590070

Property
6021590090

* Address
3500 S MERIDIAN

Reviews

There are no reviews for this permit application, or you are not authorized to view them.

Fees

Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Connection Fee $200.00 $200.00 Paid 01/15/2010
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Right Of Way Permit Conditions Resolved Engineering Division Standard Conditions
: SPECIFIC PERMIT CONDITIONS: 1. ADHERE TO APPROVED TRAFFIC CONTROL PLAN. 2. DRIVEWAY APPROACH MUST BE A MIN. 15 FEET WIDE AND MAX. 30 FEET WIDE. TOTAL WIDTH OF ALL DRIVEWAYS SHALL NOT EXCEED 50% OF PROPERTY FRONTAGE. 3. THE APPLICANT IS RESPONSIBLE FOR KEEPING THE EXISTING RIGHT-OF-WAY FREE OF DEBRIS AND DIRT. SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE IMPLEMENTED TO PREVENT OFF SITE DAMAGE. 4. THE APPLICANT IS RESPONSIBLE TO CUT AND CAP THE SANITARY SIDESEWER AT PROPERTY LINE. THE EXISTING SIDESEWER SHALL NOT BE RE-USED. 5. THE APPLICANT IS RESPONSIBLE TO DECOMMISION THE EXISTING SEPTIC SYSTEM PER P.C.H.D. REQUIREMENTS. A DECOMMISSIONING CERTIFICATE IS REQUIRED TO BE FILED WITH P.C.H.D. AND A COPY SUBMITTED TO THE CITY OF PUYALLUP. 6. THE APPLICANT IS RESPONSIBLE TO DECOMMISION THE EXISTING PRIVATE WELL PER P.C.H.D. REQUIREMENTS. A DECOMMISSIONING CERTIFICATE IS REQUIRED TO BE FILED WITH P.C.H.D. AND A COPY SUBMITTED TO THE CITY OF PUYALLUP. 7. INSTALLATION OF AN APPROVED BACKFLOW ASSEMBLY IS REQUIRED. 8. THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING.
Utility Service Repair Standard Condition Open Development & Permitting Services Standard Conditions
: Development Engineering standard utility service repair conditions: - Work between the hours of 9 AM & 3 PM. - Call communication center day(s) of lane closure at 253-287-4456. - Prior to starting site work; request inspection for erosion and sediment. - Utility inspections are required prior to backfilling. - Inspection time performed during a regular 8 hour day Monday - Friday 7:00 AM - 5:00 PM is included in the permit fee. inspection time performed outside of those hours are charged to the permit holder at a rate of $130 per hour with a three hour minimum. - Applicant/contractor shall notify the City within 48 hours prior to work start date and also to close the permit when all work and restoration are complete and ready for final inspection. - I agree to have the approved permit on site at all times. - The applicant is responsible to call the engineering inspection line at 253-435-3650 to schedule a utility inspection prior to backfilling. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right-of-way permit. - I agree to keep the existing right of way free of debris and dirt. - I agree to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - I agree to adhere to the approved traffic control plan. - I agree to perform all work in accordance with City's standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. - I hereby acknowledge that i have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless: The permittee shall defend, indemnify and hold the public entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the permittee or on the permittee's behalf out of issuance of this permit, except for injuries and damages caused by the sole negligence of the public entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this permit, then the permittee agrees to defend, indemnify and hold the public entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the permittee's waiver of immunity under industrial insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. the provisions of this section shall survive the expiration or termination of this agreement.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.