CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-10-0375


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-10-0375
Right-of-Way Vacation
Closed
MERIDIAN FUTURES LLC
Other
INSTALL TEMPORARY MONITORING WELLS AT S MERIDIAN & 5TH AND IN ALLEY TO THE SOUTH OF 401 S MERIDIAN ON 03/10/2011.
11/29/2010
03/09/2011
05/08/2011
05/06/2011

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 12/15/2010
Engineering Traffic Review In Progress 12/15/2010

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Plan Review Fee $40.00 $40.00 Paid 03/09/2011
No
Engineering Permit Fee $80.00 $80.00 Paid 03/09/2011
No
General Engineering Inspection Fee $130.00 $130.00 Paid 03/09/2011
No
Traffic Control Permit Fee $50.00 $50.00 Paid 03/09/2011
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Right Of Way Permit Conditions Resolved Engineering Division Standard Conditions
: 1. I agree to call the inspection line at 253-445-4795 OR 253-445-5092 to schedule inspections. Enter action code 6910 when prompted. 2. I agree to have the approved permit on site at all times. 3. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. 4. For Engineering questions arising in the field, please contact the Engineering Inspector at 253-405-1707. 5. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. 6. I agree to keep the existing right of way free of debris and dirt. 7. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 8. I agree to adhere to the approved Traffic Control Plan. 9. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit. PATCHBACK OF HOLES WITHIN THE RIGHT OF WAY: If the holes are greater than 1½-inches, they should be filled with either CDF or an approved non-shrink grout to within 4-inches of the wearing surface. The remaining 4-inches shall be filled with Perma-Patch asphalt patching compound. If the holes are smaller than 1½ -inches, the contractor can simply patchback with the Perma-Patch placed in 3-inch lifts and hand-tamped each lift.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.