E-12-0233
UNKOWN LEGACY PERMIT TYPE
Canceled
CITY OF PUYALLUP RON CLOWERS
Other
JOB # 105070020
08/16/2012
08/16/2012
10/26/2012
09/10/2013

Locations

Property
5745001371

* Address
330 3RD ST SW

Reviews

Review Type Outcome Est. Completion Date Completed
Legacy Activity (see Comments) VOID 12/09/2021
Engineering Review Approved 08/16/2012
Engineering Traffic Review Approved 08/16/2012

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Close All Restoration Complete Inspection VOID 12/09/2021
Legacy user

Conditions

Condition Status Department Category Expiration Date Due Date
General E-Permit For All Permits Resolved Engineering Division Standard Conditions
: JOB DESCRIPTION: Replace existing 40' utility pole with new 45' class 3 pole (P03). Replace existing overhead triplex from P01 to P02 and install new overhead triplex from P02 to P03.
Private Utility Permit Conditions Resolved Engineering Division Standard Conditions
: *** PERMIT IS REQUIRED TO BE VISIBLE AT JOB SITE *** Work between the hours of 9AM & 3PM 1. CALL 253-841-5577 24hrs PRIOR TO STARTING WORK TO OPEN PERMIT. 2. CALL 253-405-1707 TO NOTIFY INSPECTOR OF SPECIFIC PROJECT SCHEDULING. 3. ADHERE TO APPROVED TRAFFIC CONTROL PLAN. 4. DO NOT PARK VEHICLES ON CITY SIDEWALK. 5. DO NOT OPEN CUT WITHOUT PRIOR APPROVAL. 6. ANY CURB, GUTTER OR SIDEWALK DAMAGED SHALL BE REMOVED AND REPLACED. 7. CALL 253-841-5577 TO CLOSE PERMIT WHEN WORK IS COMPLETE. 8. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit. RCW 19.27 requires the city to provide notification to “transmission pipeline companies” of proposed construction within 100’ of a pipeline easement or right-of-way prior to construction activity being permitted or require consultation between the person proposing the construction activity and the transmission pipeline company as a condition of receiving the permit.
Mechanical and Plumbing OTC Conditions Resolved Engineering Division Standard Conditions
: NO WORK ALLOWED IN RIGHT-OF-WAY DURING FALL FAIR SEPTEMBER 7 - 23, 2012

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.