E-12-0298
Utility Service Repair/PRIVATE PROPERTY ONLY
Expired
BEAR VALLEY ENTERPRISES LLC
Repair
SEWER MAIN TAP FOR FUTURE SFR ZONING RS-10
10/08/2012
10/23/2012
12/22/2012

Locations

Property
4595000212

* Address
1617 9TH ST SW

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 10/08/2012
Engineering Traffic Review Approved 10/08/2012

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Plan Review Fee $40.00 $40.00 Paid 10/08/2012
No
Traffic Control Permit Fee $50.00 $50.00 Paid 10/08/2012
No
Engineering Permit Fee $80.00 $80.00 Paid 10/08/2012
No
Sanitary Sewer Connection Fee $635.00 $635.00 Paid 10/08/2012
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Right Of Way Permit Conditions Resolved Standard Conditions
Engineering Division
Overtime inspection fees will be billed for night time traffic control. No guarantee that building can connect to the sewer stub in the future if City Standards are revised. 1. I agree to call the the Engineering Inspector at 253-405-1707 prior to starting work. 2. I agree to have the approved permit on site at all times. 3. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. 4. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. 5. I agree to keep the existing right of way free of debris and dirt. 6. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 7. I agree to adhere to the approved Traffic Control Plan. 8. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Utility Service Repair Standard Condition Open Standard Conditions
Development & Permitting Services
Development Engineering standard utility service repair conditions: - Work between the hours of 9 AM & 3 PM. - Call communication center day(s) of lane closure at 253-287-4456. - Prior to starting site work; request inspection for erosion and sediment. - Utility inspections are required prior to backfilling. - Inspection time performed during a regular 8 hour day Monday - Friday 7:00 AM - 5:00 PM is included in the permit fee. inspection time performed outside of those hours are charged to the permit holder at a rate of $130 per hour with a three hour minimum. - Applicant/contractor shall notify the City within 48 hours prior to work start date and also to close the permit when all work and restoration are complete and ready for final inspection. - I agree to have the approved permit on site at all times. - The applicant is responsible to call the engineering inspection line at 253-435-3650 to schedule a utility inspection prior to backfilling. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right-of-way permit. - I agree to keep the existing right of way free of debris and dirt. - I agree to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - I agree to adhere to the approved traffic control plan. - I agree to perform all work in accordance with City's standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. - I hereby acknowledge that i have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless: The permittee shall defend, indemnify and hold the public entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the permittee or on the permittee's behalf out of issuance of this permit, except for injuries and damages caused by the sole negligence of the public entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this permit, then the permittee agrees to defend, indemnify and hold the public entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the permittee's waiver of immunity under industrial insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. the provisions of this section shall survive the expiration or termination of this agreement.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.