CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

E-14-0275


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-14-0275
UNKOWN LEGACY PERMIT TYPE
Closed
MC DONALD CORP 41/46
Other
Job # 887031494 Extension given until 12/31/2014 LL
07/16/2014
07/16/2014
04/07/2015
02/10/2015

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 02/10/2015
Engineering Review Approved 07/16/2014
Engineering Traffic Review Approved 07/16/2014

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Close All Restoration Complete Inspection Approved 02/06/2015
Linda Lian ((253) 841-5577)

Conditions

Condition Status Department Category Expiration Date Due Date
General E-Permit For All Permits Resolved Engineering Division Standard Conditions
: JOB DESCRIPTION: Investigate and repair a gas leak on the west side of 2nd St NE. A 4' x 4' asphalt cut is anticipated.
Private Utility Permit Conditions Resolved Engineering Division Standard Conditions
: *** PERMIT IS REQUIRED TO BE VISIBLE AT JOB SITE *** GOOD GUYS CAR SHOW IS JULY 25 - 27 - DURING THIS TIME THERE WILL BE NO RIGHT-OF-WAY WORK ALLOWED IN THE WA STATE FAIR ZONE. If a flagger is required preference will be given to traffic on 2nd St NE Work is allowed between the hours of 9am & 4pm as long as two lanes of travel is maintained Travel lanes will be a minimum of 11' in width 1. CALL 253-841-5577 24hrs PRIOR TO STARTING WORK TO OPEN PERMIT. 2. CALL 253-405-1707 TO NOTIFY INSPECTOR OF SPECIFIC PROJECT SCHEDULING. 3. ADHERE TO APPROVED TRAFFIC CONTROL PLAN. 4. DO NOT PARK VEHICLES ON CITY SIDEWALK. 5. DO NOT OPEN CUT WITHOUT PRIOR APPROVAL. 6. ANY CURB, GUTTER OR SIDEWALK DAMAGED SHALL BE REMOVED AND REPLACED. 7. CALL 253-841-5577 TO CLOSE PERMIT WHEN WORK IS COMPLETE. 8. RCW 19.122 requires all owners of underground facilities to notify pipeline companies of scheduled excavations through the one-number locator service if proposed excavation is within 100 feet. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.