E-17-0236


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-17-0236
UNKOWN LEGACY PERMIT TYPE
Closed
CITY OF PUYALLUP - ROW
Other
JOB:N104320 SHAW RD & 23RD AVE SE CIP - Shaw Rd Improvement Project Permit extended until 10/312017 LL 9/26/17
06/05/2017
06/30/2017
12/01/2017
01/17/2019

Locations

Property
0420355012

Property
5481001150

* Address
000 SHAW RD

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 01/17/2019
Engineering Review Approved 06/30/2017
Engineering Traffic Review Approved 06/30/2017

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Close All Restoration Complete Inspection Approved 01/17/2019
Michael Rosenau ((253) 344-6753)

Conditions

Condition Status Department Category Expiration Date Due Date
General E-Permit For All Permits Resolved Engineering Division Standard Conditions
: JOB DESCRIPTION:
Private Utility Permit Conditions Resolved Engineering Division Standard Conditions
: Follow approved TCPs Closure allowed Monday - Thursday 9am - 3pm only Flaggers to stay in radio contact at all times Note the changes to the TCP with the additional use of flaggers and signs is certain locations 1. PERMIT IS REQUIRED TO BE VISIBLE AT JOB SITE. 2. Call 253-841-5577 24hrs PRIOR to starting work to open the permit. 3. Call 253-405-1707 to notify the inspector of specific project scheduling. 4. Adhere to the approved traffic control plan. 5. DO NOT open cut without prior approval. 6. DO NOT park vehicles on city sidewalk. Curb, gutter or sidewalk damaged shall be replaced. 7. Call 253-841-5577 to closse the permit when work is complete. 8. RCW 19.122 requires all owners of underground facilities to notify pipeline companies of scheduled excavations through the one-number locator service if proposed excavation is within 100 feet. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
General E-Permit For All Permits Resolved Engineering Division Standard Conditions
: NO WORK ALLOWED IN THE RIGHT OF WAY AS DEFINED BY THE "CONSTRUCTION RESTRICTION ZONE & ROUTES MAP" DURING MEEKER DAYS JUNE 16 - 18, 2017

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.