CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

E-17-0241


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-17-0241
UNKOWN LEGACY PERMIT TYPE
Closed
COSTCO WHOLESALE CORP
Other
JOB # 193586
06/08/2017
06/14/2017
12/25/2018
11/01/2018

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 11/01/2018
Engineering Traffic Review Approved 06/14/2017
Engineering Review Approved 06/14/2017

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Close All Restoration Complete Inspection Approved 10/26/2018
rhatch

Conditions

Condition Status Department Category Expiration Date Due Date
General E-Permit For All Permits Resolved Engineering Division Standard Conditions
: JOB DESCRIPTION: Tie in at existing Comcast and place 25' riser with cable. Bor one (2") conduit with cable 5' to 17x30 vault in ROW.
Private Utility Permit Conditions Resolved Engineering Division Standard Conditions
: No traffic control plan approved as the work will be done from the private property side of the right-of-way. ** No impact to traffic is allowed ** ** If it becomes necessary to work from a travel lane a traffic control plan is required to be submitted for review and approval before proceeding ** 1. PERMIT IS REQUIRED TO BE VISIBLE AT JOB SITE. 2. Call 253-841-5577 24hrs PRIOR to starting work to open the permit. 3. Call 253-405-1707 to notify the inspector of specific project scheduling. 4. Adhere to the approved traffic control plan. 5. DO NOT open cut without prior approval. 6. DO NOT park vehicles on city sidewalk. Curb, gutter or sidewalk damaged shall be replaced. 7. Call 253-841-5577 to closse the permit when work is complete. 8. RCW 19.122 requires all owners of underground facilities to notify pipeline companies of scheduled excavations through the one-number locator service if proposed excavation is within 100 feet. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
General E-Permit For All Permits Resolved Engineering Division Standard Conditions
: NO WORK ALLOWED IN THE RIGHT OF WAY AS DEFINED BY THE "CONSTRUCTION RESTRICTION ZONE & ROUTES MAP" DURING THE GOODGUYS PNW NATIONALS JULY 28 - 30, 2017.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.