Summary

E-17-0517
Alternative Methods / Materials Request
Closed
MULTICARE HEALTH SYSTEM C/O LOREDANA IONESCU
Other
PROPOSED LOCATION OF GSH NEW GAS GENERATOR - STANDARDS 204.4.9 / 205.1.4 / 205.1.5
12/04/2017
12/26/2017
12/04/2018
12/26/2017

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Public Works Water Review VOID 12/09/2021
Public Works Streets Review VOID 12/09/2021
Engineering Traffic Review VOID 12/09/2021
Engineering Review Approved 12/26/2017
Fire Review Approved 12/22/2017
Public Works Collection Review Approved 12/22/2017
External Agencies Review Approved 12/22/2017
Engineering Storm Review Approved 12/22/2017

Fees

Paid Fees Amount Paid Owing Date Paid
Alternative Method/Construct Fee $250.00 $250.00 Paid 12/04/2017
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
General E-Permit For All Permits Resolved Building Division Standard Conditions
: E-PERMIT CONDITIONS: Mark J. Servizi, P.E. has signed and stamped a LPD Memorandum dated 12/21/2017 stating that the existing storm system will not be compromised by the weight/placement of the CHP Engine if the following items are addressed during design and construction: 1. The concrete pad must be designed to distribute loads and prevent cracking 2. Ductile iron pipe shall have minimum cover as recommended by the manufacturer 3. Any point loads shall be designed to distribute loads below the pipe and/or neighboring foundations The three conditions above are required to be adhered to and will be conditions placed on the building permit for the CHP Engine.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.