CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-18-0253


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-18-0253
Right-of-Way Vacation
Closed
MERIDIAN PLACE LLC
Other
2 ADA RAMP MODIFICATIONS ~ SOLA SALON
04/27/2018
05/14/2018
07/13/2018
11/05/2018

Locations

Property
0419102074

* Address
4301 S MERIDIAN

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 05/14/2018
Engineering Traffic Review Approved 05/14/2018

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Permit Fee $50.00 $50.00 Paid 05/10/2018
No
Traffic Control Plan Review Fee $40.00 $40.00 Paid 05/10/2018
No
Engineering Permit Fee $80.00 $80.00 Paid 05/10/2018
No
General Engineering Inspection Fee $130.00 $130.00 Paid 05/10/2018
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Night Traffic Control Overtime Inspection Fee Resolved Engineering Division Standard Conditions
: Whenever work is progressing within the city, inspectors are required to be available for inspection. Therefore, work beyond a regular 8 hour day also needs inspected. If your project is the only one operating at that time, you will be required to pay for the inspector to be there full time (3 hour minimum call out time). Whenever possible, the city will distribute fees among other projects working at the same time.
Right Of Way Permit Conditions Resolved Engineering Division Standard Conditions
: ** Work between the hours of 9pm and 5am Sunday nights - Thursday nights only ** ** Prior to scheduling work coordinate with City Inspector, Marcus Sedlickas, @ 253-405-1707 ** 1. I agree to call the the Engineering Inspector at 253-405-1707 prior to starting work. 2. I agree to have the approved permit on site at all times. 3. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. 4. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. 5. I agree to keep the existing right of way free of debris and dirt. 6. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 7. I agree to adhere to the approved Traffic Control Plan. 8. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. Enter Action Code 6910 to schedule an inspection using the automated inspection line. 11. TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/ The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.