Engineering Permit Application Status

E-18-0487


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-18-0487
Right-of-Way Vacation
Closed
GOOD SAMARITIAN HOSPITAL
Other
ADA RAMP AND DRIVEWAY UPGRADES ~ REPLACES E-17-0024
10/01/2018
11/14/2018
04/29/2024
11/01/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 10/12/2018
Engineering Traffic Review Approved 10/12/2018

Fees

Paid Fees Amount Paid Owing Date Paid
General Engineering Inspection Fee $130.00 $130.00 Paid 10/01/2018
No
Engineering Permit Fee $80.00 $80.00 Paid 10/01/2018
No
Traffic Control Permit Fee $50.00 $50.00 Paid 10/01/2018
No
Traffic Control Plan Review Fee $40.00 $40.00 Paid 10/01/2018
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Daily Inspection Failed 10/31/2023 10/31/2023
Jason Little ((253) 244-0387)

Conditions

Condition Status Department Category Expiration Date Due Date
Right Of Way Permit Conditions Resolved Engineering Division Standard Conditions
: *** YIELD TO ALL EMERGENCY VEHICLES *** * Flaggers must be in radio contact at all times * * Notify hospital 72 hours in advance of beginning work * Call Marcus Sedlickas, Engineering Inspector, at 253-405-1707 for any questions regarding construction, restoration or TCPs. Marcus is also available for a preconstruction meeting, this is not required but is recommended. Follow approved Traffic Control Plan (TCP) Work between the hours of 9am & 3pm Call Comm Center day(s) of lane closure at 253-841-5431 A. Distance between cones equals speed limit in unit feet. B. Taper length equals width of offset times speed limit squared divided by 60. L = WS² /60 - W= lane width S = speed limit C. Sign spacing shall be 100 feet when speed limit is 30 MPH or less D. Sign spacing shall be 350 feet when speed limit is greater than 30 MPH E. Distance between signs is mandatory unless field conditions determine otherwise. 1. I agree to call the the Engineering Inspector at 253-405-1707 prior to starting work. 2. I agree to have the approved permit on site at all times. 4. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. 5. I agree to keep the existing right of way free of debris and dirt. 6. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 7. I agree to adhere to the approved Traffic Control Plan. 8. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced. 9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. 10. Enter Action Code 6910 to schedule an inspection using the automated inspection line. 11. TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.cityofpuyallup.org/ The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.