CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-18-0562


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-18-0562
Civil Construction Permit
Closed
PUYALLUP SCHOOL DIST NO 3
Other
WAREHOUSE BUILDING ADDITION ~ PSD
11/29/2018
03/20/2019
03/19/2021
03/04/2020

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 03/04/2020
Public Works Water Review Approved 03/15/2019
Engineering Storm Review Approved 03/15/2019
Engineering Civil Review Approved 03/15/2019
Fire Review Approved 12/20/2018
Planning Review Approved 12/10/2018

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Permit Fee $300.00 $300.00 Paid 03/18/2019
No
Civil Review Additional Fee $1,820.00 $1,820.00 Paid 03/18/2019
No
Engineering Inspection Fee (3%) $12,215.70 $12,215.70 Paid 03/18/2019
No
Storm System Development Charge $19,518.00 $19,518.00 Paid 03/18/2019
No
Civil Review Fee $470.00 $470.00 Paid 11/29/2018
No
Record Drawing Review Fee $200.00 $200.00 Paid 11/29/2018
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Resolved Engineering Division Standard Conditions
: 1. Construction permitted as per approved civil plans. 2. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abondoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4- SEPERATE PERMITS REQUIRED FOR FIRE ALARM AND FIRE SPRINKLER SYSTEM 6- FIRE EXTINGUISHERS REQUIRED PER CODE 7- UPDATE KEY IN KNOX BOX. IF NOT INSTALLED A KNOX BOX IS REQUIRED 8- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL INSPECTION REQUEST CODES: 2252 EXIT LIGHT TEST 5610 EMERGENCY RADIO TEST 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8PM TO SET UP A TIME. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-864-4171
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.