CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-19-0225


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-19-0225
Franchise Utility Permit
Closed
BCC PUYALLUP LLC
Other
JOB # N.491827
05/20/2019
07/24/2019
01/26/2020
02/03/2020

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Traffic Review VOID 12/09/2021
Engineering Traffic Review VOID 12/09/2021
Engineering Review Approved 01/14/2020
Engineering Traffic Review Approved 07/23/2019
Engineering Review Approved 07/23/2019

Fees

Paid Fees Amount Paid Owing Date Paid
ROW Permit Fee $80.00 $80.00 Paid 08/14/2019
No
Franchise Traffic Control Fee $90.00 $90.00 Paid 08/14/2019
No
Franchise Utility Review Fee $110.00 $110.00 Paid 08/14/2019
No
Legacy Fee $110.00 $110.00 Paid 08/14/2019
No
E Franchise ROW Inspection Fee $130.00 $130.00 Paid 08/14/2019
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
General E-Permit For All Permits Resolved Engineering Division Standard Conditions
: JOB DESCRIPTION:
Private Utility Permit Conditions Resolved Engineering Division Standard Conditions
: Required Calls and notifications to be made by applicant: " Call Comm Center day(s) of lane closure at 253-841-5431 " Call 253-435-3612 24hrs PRIOR to starting work to open the permit. " Call 253-405-1707 to notify the inspector of specific project scheduling. " Call 253-435-3612 to close the permit when work is complete. " RCW 19.122 requires all owners of underground facilities to notify pipeline companies of scheduled excavations through the one-number locator service if proposed excavation is within 100 feet. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. Traffic Control: Follow approved Traffic Control Plan (TCP) If scope of work or traffic control changes, a new TCP is required. For Lane Closures, work Monday through Thursday 10am - 2pm. For shoulder closure, work Monday through Friday 9am - 3pm. Traffic Control Devices: A. Distance between cones equals speed limit in unit feet. B. Taper length equals width of offset times speed limit squared divided by 60. L = WS² /60 - W= lane width S = speed limit C. Sign spacing shall be 100 feet when speed limit is 30 MPH or less D. Sign spacing shall be 350 feet when speed limit is greater than 30 MPH E. Distance between signs is mandatory unless field conditions determine otherwise. Other Conditions: 1. PERMIT IS REQUIRED TO BE VISIBLE AT JOB SITE. 2. DO NOT open cut without prior approval. 3. DO NOT park vehicles on city sidewalk. Curb, gutter or sidewalk damaged shall be replaced.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.